background image

8

BRDG

BRDG

BRIDGE  STUDIOS

UNBOXING

 - OPEN THE ROLLING CASE AND LAY OUT ALL PARTS FLAT ON THE 

GROUND.  

- REFER TO PAGES 5 TO MAKE SURE NOTHING IS MISSING.  

- REMOVE GRAPHICS BUT DO NOT REMOVE THEM FROM ROLLS.

- EACH CASE SHOULD INCLUDE A TOOL AND HARDWARE SET.

Содержание HBO max

Страница 1: ...1 BRDG BRDG BRIDGE STUDIOS B R I D G E S T U D I O S BRDG HBO TAKEDOWN TIER 1 INSTRUCTIONS ...

Страница 2: ...KERS 6 GRAPHICS 7 UNBOXING 8 UNIT ASSEMBLY 9 17 SCREEN MOUNTING 18 19 GRAPHIC APPLICATION 20 21 https brdg co take down 1 This booklet includes all assembly instructions and information for HBO Max Take Down 1 Scan above QR code or enter URL to access online version Contact us 1 844 999 2734 support brdg co ...

Страница 3: ...3 BRDG BRDG BRIDGE STUDIOS OVERVIEW T1 F T1 D T1 E BASE PLATE T1 F CABINET STEEL PLATES WITHOUT GRAPHICS T1 08 T1 08 T1 10 T1 08 T1 11 T1 11 T1 11 T1 12 T1 11 T1 08 ...

Страница 4: ...4 BRDG BRDG BRIDGE STUDIOS LAYOUT AND DIMENSIONS QTY 4 QTY 4 QTY 2 QTY 1 QTY 1 ...

Страница 5: ...GHT HAND PANEL 1 TI F SIDE PANELS 2 T 08 OUTER SIDE TRIM 4 T2 09 INNDER SIDE TRIM 1 T1 10 INNER TOP TRIM 1 T1 11 OUTER TOP TRIM 2 T1 12 MIDDLE TOP TRIM 1 CABINET METAL FRAME THAT HOLDS SCREEN 1 HARDWARE BAG EQUIPMENT 1 TOOL BAG EQUIPMENT 1 MAGNETIC PANELS APPLICABLE GRAPHICS 6 SCREEN DISPLAY 1 ...

Страница 6: ...LABELED WITH A STICKER THE QR CODE LEADS TO A WEBSITE WITH INFORMATION ABOUT THIS UNIT AND THIS GUIDE AS A DOWNLOADABLE PDF ALL STICKERS ARE POSITIONED IN THE BOTTOM RIGHT HAND CORNER ON THE BACK OF THE PANEL ALL STICKERS ON TRIM ARE TO BE FACING INWARD WHEN THE TRIM IS APPLIED SO THAT THEY ARE NOT VIS IBLE AFTER ASSEMBLY ...

Страница 7: ...7 BRDG BRDG BRIDGE STUDIOS GRAPHICS FRONT BACK ...

Страница 8: ...DIOS UNBOXING OPEN THE ROLLING CASE AND LAY OUT ALL PARTS FLAT ON THE GROUND REFER TO PAGES 5 TO MAKE SURE NOTHING IS MISSING REMOVE GRAPHICS BUT DO NOT REMOVE THEM FROM ROLLS EACH CASE SHOULD INCLUDE A TOOL AND HARDWARE SET ...

Страница 9: ...HE BASE PLATE AND STAND IT UP ON ITS SIDE THREAD THE 3 8 16 x 2 BOLTS THROUGH THE BASE PLATE HOLES LIGHTLY HAND TIGHTEN 3 8 15 NUTS SO THAT BOLTS REMAIN IN PLACE WHEN LAID FLAT ON GROUND LAY BASE PLATE DOWN FLAT WITH THREADS FACING UPWARD REMOVE NUTS ...

Страница 10: ...RDG BRIDGE STUDIOS UNSCREW BACK PANEL SCREWS USING ALLEN WRENCH ONE INCLUDED IF NECESSARY AND UNLOCK TOP LOCKS USING A FLAT HEAD SCREWDRIVER ONE INCLUDED IF NECESSARY REMOVE BACK PANEL FROM CABINET UNIT ASSEMBLY ...

Страница 11: ...ABINET UP AND PLACE IT DOWN SO THAT THE BOLTS FROM THE BASE PLATE GO THROUGH THE BOTTOM SLOTS ALIGN THE BOLTS TO THE MIDDLE OF THE SLOTS SECURE BASE PLATE TO CABINET WITH 3 8 X 1 WASHERS AND 3 8 16 NUTS AND TIGHTEN FULLY USING INCLUDED WRENCH UNIT ASSEMBLY ...

Страница 12: ...GER HOLES WITH T1 F ON ITS SIDE ALIGN THE HOLES IN THE TRIM AND BASEPLATE WITH THOSE ALONG THE BOTTOM OF T1 F THE PLATE WILL ONLY FIT ON ONE WAY THE EXTRUDED FOOT WILL FACE OUTWARD FROM THE UNIT CAREFULLY THREAD TWO 3 8 16 X 2 BOLTS BEFORE FULLY TIGHTENING WITH INCLUDED SCREW DRIVER UNIT ASSEMBLY ...

Страница 13: ...1 THROUGH 13 FOR THE OTHER T1 F ALIGN THE HOLES ON THE INNER SIDE OF ASSEMBLED T1 F SIDE WITH OUT THE BOTTOM LIP AND THE HOLES ON THE SIDES OF THE CABINET SLIDE TRIM T1 09 BETWEEN THE CABINET AND T1 F AND LINE ITS HOLES UP AS WELL UNIT ASSEMBLY ...

Страница 14: ...TS WITH 8 32 WASHERS FROM THE CABINET S INTERIOR HOLES THROUGH THE TRIM AND INTO THE HOLES ON THE INSIDE OF T1 F USING A PHILIPS HEAD SCREWDRIVER ONE INCLUDED IF NECESSARY DO NOT FULLY TIGHTEN SCREWS REPEAT STEPS 15 THROUGH 17 FOR THE OTHER T1 F UNIT ASSEMBLY ...

Страница 15: ...IM T1 12 ALONG TOP AND THEN BOTH T1 10 ALONG BOTTOM WITH 8 32 X 1 1 2 BLACK HEX BOLTS USING THE ALLEN WRENCH DO NOT TIGHTEN SCREWS UNTIL ALL TRIM IS PROPERLY ALIGNED THIS STEP MUST BE COMPLETED BEFORE YOU ATTEMPT TO LIFT THIS PIECE THE SEAM BETWEEN T1 D AND T1 E IS FRAGILE UNIT ASSEMBLY ...

Страница 16: ...S WITH A PERSON ON EITHER SIDE AND ONE PERSON IN THE MIDDLE LIFT THE ASSEMBLED TOP OF THE UNIT LIFT THE TOP OVER THE CABINET ANDTHE TOPS OF BOTH T1 F S ONCE IN PLACE TIGHTEN ALL OF THE SCREWS INSIDE OF THE CABINET UNIT ASSEMBLY ...

Страница 17: ...TOP LEFT AND RIGHT USING ALLEN WRENCH AND 8 32 X 1 1 2 BLACK HEX BOLTS ATTACH T1 08 TRIM ON LEFT AND RIGHT SIDES USING ALLEN WRENCH AND 8 32 X 1 1 2 BLACK HEX BOLTS DO NOT TIGHTEN ALL BOLTS UNTIL YOU ARE SURE THE TRIM IS PROPERLY ALIGNED UNIT ASSEMBLY ...

Страница 18: ...G BRDG BRIDGE STUDIOS LIFT SCREEN ONTO LEDGE ON THE BACK OF THE CABINET WITH ITS DISPLAY FACING OUT CAM STRAPS SHOULD BE THREADED THROUGH SIDE BRACKETS TIGHTEN THEM UNTIL THE SCREEN IS SECURE SCREEN MOUNTING ...

Страница 19: ...9 BRDG BRDG BRIDGE STUDIOS PLUG IN ALL CABLES THE HDMI CABLE MUST GO INTO THE HDMI 1 PORT ON THE SCREEN PUT BACK PANEL ON UNIT AND SCREW IN WITH ALLEN WRENCH AND 8 32 X 1 BLACK HEX BOLTS SCREEN MOUNTING ...

Страница 20: ... UNROLL MAGNETIC GRAPHICS HAVE ONE PERSON HOLD UP EACH SIDE NEVER BEND OR FOLD GRAPHICS THEY CREASE EASILY APPLY GRAPHIC STARTING FROM OUTER EDGE AND WORK INWARD ALIGN WITH TRIM REPOSITION AS NECESSARY APPLY GRAPHICS FROM RIGHT TO LEFT FRONT TO BACK ...

Страница 21: ...21 BRDG BRDG BRIDGE STUDIOS ...

Страница 22: ...22 BRDG BRDG BRIDGE STUDIOS ALL DONE ...

Отзывы: