12
BRDG
BRDG
BRIDGE STUDIOS
- LOCATE BOTH T1-F’S, THEIR BASEPLATES, AND THE T1-11 TRIM WITH
THE LARGER HOLES.
- WITH T1-F ON ITS SIDE, ALIGN THE HOLES IN THE TRIM AND BASEPLATE
WITH THOSE ALONG THE BOTTOM OF T1-F. THE PLATE WILL ONLY FIT ON
ONE WAY. THE EXTRUDED FOOT WILL FACE OUTWARD FROM THE UNIT.
- CAREFULLY THREAD TWO 3/8-16 X 2” BOLTS BEFORE FULLY TIGHTENING
WITH INCLUDED SCREW DRIVER
UNIT ASSEMBLY
Содержание HBO max
Страница 1: ...1 BRDG BRDG BRIDGE STUDIOS B R I D G E S T U D I O S BRDG HBO TAKEDOWN TIER 1 INSTRUCTIONS ...
Страница 4: ...4 BRDG BRDG BRIDGE STUDIOS LAYOUT AND DIMENSIONS QTY 4 QTY 4 QTY 2 QTY 1 QTY 1 ...
Страница 7: ...7 BRDG BRDG BRIDGE STUDIOS GRAPHICS FRONT BACK ...
Страница 21: ...21 BRDG BRDG BRIDGE STUDIOS ...
Страница 22: ...22 BRDG BRDG BRIDGE STUDIOS ALL DONE ...