7
LEVEL THE BASE USING THE LEVELERS UNDER EACH LIFTING COLUMN.
8
LEVELERS
PLACE THE WORK SURFACES ON THE TOP FRAMES AND ALIGN THEM USING THE
PILOT HOLES. PILOT HOLES SHOULD BE ALIGNED WITH END BRACKET HOLES.
ALL WORK SURFACES ON ONE SIDE HAVE 3 PILOT HOLES AND ON THE OTHER SIDE
ONLY 2. THE SIDE THAT HAS 3 PILOT HOLES WILL ALWAYS SIT TOWARD THE
CONNECTION POINT OF THE WORK SURFACES AND THE SIDE THAT HAS 2 PILOT
HOLES
WILL
SIT ON THE ENDS.
MAKE SURE THERE IS A 3/4" GAP IN BETWEEN TWO WORK SURFACES.
X 32
5
Содержание NoLita
Страница 1: ...NoLita Installation Guide 1 ...