background image

5

6

CONNECT THE LIFTING COLUMN WIRING AND POWER THEM UP.

 

POSITION THE LIFTING COLUMNS AT MAXIMUM HEIGHT.

4

CONNECT THE WIRE MANAGER BRACKET TO THE SPECIFIED LOCATION 
WITH THE PROVIDED SELF TAPPING SCREWS.

REPLACE

 TRIMS AND PANELS.

X 2

Отзывы: