Assembly Instructions
38
Step 12
Attach the Cylinder Hoses to the High
Pressure Fittings.
High pressure fittings
Long hose
Short hose
Step 13
Connect the Long Low Pressure Hose to the
Hydraulic Tank Assembly and the Control
Valve with the Hose Clamps.
Connect the Short Low Pressure Hose to the
Hydraulic Tank Assembly and the
Hydraulic Pump with the Hose Clamps.
Long hose
Control valve
Tank assembly
Hose clamps
Short hose
Step 15
Fill Log Splitter with Hydraulic Fluid as
outlined in the Initial Unpacking & Set-Up
section of the manual.
Fill Engine with SAE 10W-30 as
recommended by the Engine Manufacturer.
Step 14
Install the Log Tables to the Beam
Assembly. A soft-faced mallet may be
required.
Secure the Log Tables with the supplied
Cotter Pins.
Cotter pins
Log tables
Beam assembly
Содержание MPCLS2013E.2
Страница 2: ...Hazard Signal Word Definitions 2 ...
Страница 25: ...Parts Breakdown Exploded View Rev E 2 25 ...
Страница 33: ...Assembly Instructions 33 ...