Page 46
Maintenance and Lubrication Schedule
Perform all procedures listed in previous section also
1500
Cycles
continued
Rotating pivot slide arm pivot pins (2)
Parallel arm pivot bearings (16)
Handrail pivot pin bearings (4)
Hydraulic cylinder bushings (8)
Inspect Lift-Tite
™
latch rollers for wear or damage,
positive securement and proper operation (2)
Inspect outer barrier feet for proper operation,
positive securement and detached or missing tor-
sion spring
Inspect inner roll stop for:
• Wear or damage
• Proper operation. Roll stop should just rest on
top surface of the threshold (base) plate.
• Positive securement (both ends)
Inspect handrail components for wear or damage,
and for proper operation
Apply Light Oil - See Lubrication Diagram
Apply Light Oil - See Lubrication Diagram
Apply Light Oil - See Lubrication Diagram
Apply Light Oil - See Lubrication Diagram
Correct, replace damaged parts and/or relubri-
cate.
Correct, replace damaged parts and/or relubri-
cate.
Resecure, replace or correct as needed. See
Platform Angle Instructions and Floor Level
Adjustment Instructions.
Replace damaged parts.