26
EN
2 /
INSTALLING YOUR APPLIANCE
ASSEMBLING THE VENTILATION
SHAFT
•
•
Outdoor evacuation
- Calculate the final height for fixing the duct sup-
port U-bracket (part B Pic 1)
- Mark the two holes accordingly
- Drill 8 mm diameter holes and secure the duct
support bracket, ensuring that it is fixed on the
same axis as the hood (part B Pic. 1)
- Fix the flat bracket behind the lower duct (part
C Pic. 4).
--Fix the two ducts to the hood (Pic. 5)
- Connect the sleeve to the air outlet to the out-
side.
- Make the electrical connection to the hood
using the mains supply cable.
- Lift the upper duct up to the ceiling and fix it to
the bracket using the screws.
•
•