I n s t a l l a t i o n C h e c k l i s t
I n s t a l l a t i o n C h e c k l i s t
12
SELECT SUITABLE LOCATION
z
Room layout
z
Wall stud location/clearance
z
Gas and electricity available
z
Flue clearances OK, no obstructions
UNPACK HEATER
z
Remove plastic film
z
Remove 2 transit screws from top rear of cover
z
Remove cover retaining screws from bottom (above top louvre inside air outlet)
FIT MOUNTING BRACKETS
z
Remove existing mounting brackets
z
Fit bottom mounting brackets (right hand bracket 100mm higher than left)
z
Fit top mounting bracket (fit flue extension/flue adaptor if required for connection to existing
flue system)
FIT FLUE SYSTEM
z
Must comply with current requirements of AS5601
FIT FLUE COVER COMPONENTS (console installation only)
z
Refer instructions in Console & Flue Cover Kit
FIT REAR REGISTER COMPONENTS
z
Refer instructions in Rear Register Kit
FIT HEATER ONTO MOUNTING BRACKETS
z
Slide heater flue spigot up through top mounting bracket
z
Lower bottom of heater onto BOTH bottom mounting brackets
z
Fit thermostat bracket to wall or skirting board 50mm below heater
CONNECT GAS AND ELECTRICITY
z
Gas inlet fitting - 1/2" compression fitting on gas valve
z
Power point within 900mm from left or 400mm from right
z
DO NOT COIL EXCESS POWER LEAD INSIDE APPLIANCE
COMMISSIONING
z
Check for gas leaks
z
Check gas pressure
z
Check ignition and pilot flame
z
Check room fan operation
FIT FRONT COVER
z
Fit console sides and top bracket (console installations only)
z
Hook on at top, push in at bottom - CONNECT EARTH LEAD
z
Fit cover retaining screws (above top louvre inside air outlet)
INSTRUCT USER ON HEATER OPERATION