Braemar BM Скачать руководство пользователя страница 1

ILL1456-A

(English) (CPL CPS LCB BM)

(Original English Instructions)

CPL CPS LCB BM Evaporative Cooler

INSTALLATION MANUAL

®

Содержание BM

Страница 1: ...ILL1456 A English CPL CPS LCB BM Original English Instructions CPL CPS LCB BM Evaporative Cooler INSTALLATION MANUAL ...

Страница 2: ... and commission the product in compliance with these instructions or failure to do the job properly and competently may void the customer s warranty Further it could expose the Installer and or the Retailer to serious liability ...

Страница 3: ...ATER MORE WATER ILL998 B Step 16 1 Clean up the site Step 3 1 Test run the cooler 1 Complete the checklist Auto Cool TIMER AUTO COOL ILL1128 A Auto Cool TIMER AUTO COOL ILL1128 A SEELEY INTERNATIONAL INSTALLATION MANUAL 1 1 Show the customer how to operate their new cooler 2 Give the customer their owners manual 1 Cut cable hole in dropper 2 Position level and secure the dropper 3 Flash the droppe...

Страница 4: ... Corner Pillar 12 Water Sensor 13 Float Valve 14 Water Pump 15 Drain Valve 16 Motor Power Lead 17 Power Cord Assy 18 Electronics Module 19 Pump Hose 20 Venturi Fan Assy 21 Lid 22 Distributor Cap 23 3 4 to 1 2 BSP Adaptor 24 Bleed Funnel 25 Bush Bleed Funnel 26 Nut 40mm Bleed Funnel Drain Valve 27 Drain Adaptor 28 Nut Drain Adaptor Water Inlet Configuration CPL CPS LCB BM Bleed Funnel Water Inlet C...

Страница 5: ... condition is the roof in Should the trusses underside or surface be checked Does the worker have appropriate foot wear Flat sole jogger type is advisable Are all power cables extension leads safe and appropriately rated Are all ladders tools and equipment suitable in good condition Where ladders are to be used is there a firm stable base for them to stand on Can they be tied or secured in some wa...

Страница 6: ... PAD FRAMES To remove a pad frame first disengage the top clips of the pad frame Insert a screw driver tip into the slot between the lid and the top of the pad frame and lever until disengagement occurs Fig 2 part 1 Take hold of the pad frame and pull it towards you until the internal side clips disengage Fig 2 part 2 Pivot the pad frame outwards and lift up Take care not to damage the pad Fig 2 p...

Страница 7: ...ighbours before carrying out the installation Note Do you need to discuss the installation of items like safety anchor points or access with the customer The 550mm x 550mm dropper duct must have a raw edge or safe edge at the top Do not turn in a flange as this will interfere with the transition and weatherdamper Remove the transition and flash the dropper carefully so there is no chance of any wa...

Страница 8: ...ns for screws Only use the screws provided These must be used in the correct positions Fig 10 to prevent interference with the weatherdamper All eight 8 screws must be used Check the level periodically before driving in all the screws IMPORTANT There must be no obstructions to the weatherdamper opening fully as it will adversely affect the performance of the cooler Break off both clips on the tran...

Страница 9: ...ank hole Fig 12 Always handle the cooler with care If you intend to pull the cooler onto the roof using a ladder as a slide then guide the cooler on the underside of the tank Fig 13 Once the cooler is on the roof carefully lift the assembly onto the transition and into place The assembly will only fit onto the transition in one orientation Ensure that the clips in all four corners engage correctly...

Страница 10: ...ds in the dropper so they will be accessible from inside the roof space Pass the cords through the grommet in the dropper Do not coil the excess length of the power cord Place excess length of the thermostat cable in the roof cavity and not inside the cooler or dropper Push the cables into the cable slot in the transition as shown thermostat cable first and then seal the hole with the plug provide...

Страница 11: ...ut off in the water supply line adjacent to the cooler this allows the water supply to be isolated whenever work needs to be done on the cooler subject to local plumbing regulations It is not recommended to use a non return type shut off valve The water connection is a 1 2 BSP compression fitting on the end of a flexible hose This can fit directly onto the water pipe or be screwed directly onto th...

Страница 12: ...e floor in the most used room in the home This will give the optimum temperature sensing and operating position for the user Avoid direct sunlight exposure Avoid mounting on external walls Avoid mounting the wall control near heat sources such as stoves and televisions Do not locate in the direct airflow of the duct outlets Do not locate in strong drafts or in dead spots such as cupboards drawers ...

Страница 13: ...egulations Do not drain directly onto the roof surface The bleed rate required will vary according to water quality but should initially be set to the minimum rate as set out in the table LCB 250 BM500 CPL450 CPS450 1 Plug in LCB 350 BM750 CPL700 CPS700 1 Plug in LCB 450 BM900 CPL850 CPS850 2 Plugs in LCB 550 BM1150 CPL1100 CPS1100 2 Plugs in Push the remaining plugs into the blind holes provided ...

Страница 14: ...te the cable as shown Figs 24 25 This will be connected later Now clip the solenoid cover in place and connect the flexible hose to the mains water supply DRAIN VALVE Standard for LCB models optional for CPL CPS BM models Assemble the drain valve instead of the bleed tray if you have installed the solenoid valve Assemble the drain valve as shown Fig 26 Make sure that the o ring is fitted before pl...

Страница 15: ...e all the way around Fig 29 C Ensure the plug lead assy is not caught under the bottom lip of the venturi by pulling the lead through fully For CPL and BM models only D Feed the motor lead through the channel Fig 29 A in the mounting bracket where the Electronics Module sits Snare the lead into one of the brackets at the top of the opening Fig 29 A o not refit the 2 transport screws removed whilst...

Страница 16: ... valve plugs as shown Ensure the plugs are connected in the correct orientation see bottom of Fig 32 Route the drain valve cable as shown before connecting it to the electronics module Fig 33 Finally turn on the isolation switch replace the pad frames except the front pad frame to allow access and turn on the power at the GPO and the distribution board If you have installed the bleed tray ensure t...

Страница 17: ... process must be carried out within four 4 minutes of mains power being applied to the Cooler If unsure of the time since the mains power was applied remove mains power to the cooler for a minimum of six 6 seconds and then re apply power so the mode can be entered For LCB models the drain frequency is managed by salinity control There is no need for adjustment If you installed the drain valve inst...

Страница 18: ... before it will start in Manual control mode Man will display as shown The display will flash Pre Cool Cycle and the pump will operate to saturate the pads The pump will start immediately for units with the bleed tray for units with a drain valve there will be a delay before the pump commences operation 30 seconds after the water reaches the water sensor The Pre Cool will be in operation for 2 min...

Страница 19: ...run the cooler and ensure that everything is working as it should Check that the unit runs quietly and with an even distribution of air to all outlets If a drain valve is fitted initiate a drain of the tank by pressing both the up and down buttons together with the wall control in the OFF state Fig 41 Check the drain fittings and pipes making sure there are no leaks Ensure the drain water discharg...

Страница 20: ...ely Determine cause and rectify 3 Weatherdamper failing to open Break off transport clips Check for weatherseal transition screw interference Check minimum fan speed setting PROBLEM Continually leaking water when turned off CAUSE REMEDY 1 Dirt under drain valve seal Clean and refit seal clean any remaining debris from tank 2 Dirt under float valve seal Clean and refit seal 3 Damaged float valve se...

Страница 21: ...ule not communicating Reset the wall control press and hold for 10 seconds Wall control displays SERVICE and does not clear by until SERVICE disappears from the display pushing ON OFF 5 Electronics module variant incorrect for mains Note the electronic modules rating label for supply frequency supply frequency Change the supplied electronic module to the correct variant Wall control displays SERVI...

Страница 22: ...the Control box as required i e Power supply Motor cable Control loom Drain valve Solenoid cable Pump cable Probe cable The owner has been instructed how they can electrically isolate the unit at the meter box in case of an emergency All ducts are hung correctly and there are no air leaks The system has been run from the customers wall control and all functions work correctly All wall holes behind...

Страница 23: ......

Страница 24: ...the specifications of the model selected Seeley International Technical Support Seeley Spare Parts Distributors Authorised Service Agents seeleyinternational com service Spare Parts Information 1300 650 399 1300 367 437 1300 650 644 For access to Technical Installation Service Information register online To identify and order spare parts for Seeley International products online go to seeleyinterna...

Отзывы: