Problem

Cause

Solution

The signal light and horn (if 
applicable) does not operate 
when water flows.

No power to the signal station.

Check that the circuit breaker or fuse is supplying power to the 
signal station

Component failure.

Check the two 3 Amp 24VDC fuses on the print circuit board in 
the signal station enclosure.

No input power.

Check that there is 24VDC being supplied from the power supply 
mounted on the print circuit board in the signal station enclosure.

Water flowing in wrong 
direction for flow switch body.

Verify that the direction of the water flow corresponds to the arrow 
on the flow switch body.

Insufficient water flow.

Check that water flow is sufficient (2.4 gallons per minute is 
required).

Installation error.

Check all electrical connections, including power supply at the 
quick-connect cable, from the signal station to the flow switch.

Horn sounds and signal light 
does not light.

Component failure.

Check light connections and filament in the light.

Area light does not operate.

No power to the signal station.

Check that the circuit breaker or fuse is supplying power to the 
signal station

Component failure.

Check the two 3 Amp 24VDC fuses on the print circuit board in the 
signal station enclosure.

No input power.

Check that there is 24VDC being supplied from the power supply 
mounted on the print circuit board in the signal station enclosure.

Component failure.

Check light connections and filament in the light.

Beacon light does not 
operate. (This light should 
turn off when the signal light 
turns on and back on when 
the signal light turns off.)

Fixture in use.

Make sure that the flow switch contacts are open (horn and/or 
signal light are not ON).

Power disconnected in error.

Check that the circuit breaker or fuse is supplying power to the 
signal station.

Component failure.

Check the 3 Amp 24VDC fuses on the print circuit board in the 
signal station enclosure.

No input power.

Check that there is 24VDC being supplied from the power supply 
mounted on the print circuit board in the signal station enclosure.

Component failure.

Check light connections and filament in the light.

Содержание S19-324D2

Страница 1: ...ups C and D with Selector Switch Explosion Proof Emergency Signaling System Table of Contents Pre Installation Information 2 3 Components 4 Install Flow Switch and Mount Signaling Assembly 5 Connect Signaling Assembly To Flow Switch 6 Complete Electrical Supply Connections 6 Conduit Seals 6 Test the Signaling System 7 Maintenance 7 Remote Sensing Option 7 Service of Lights 8 Troubleshooting 9 Serv...

Страница 2: ...beginning installation and after installation is complete Test the unit for leaks and adequate water flow Main water supply should be ON at all times unless system is being serviced Provisions shall be made to prevent unauthorized shutoff CAUTION Supply the unit with clean potable water NOTICE Before installing this product ensure that there are adequate clearances around the product and activatio...

Страница 3: ...ncy fixtures require a minimum of 30 PSI 0 21MPa flowing pressure Weekly activation must be conducted on all plumbed emergency equipment to ensure a suitable flushing fluid supply is present and any sediment build up in the supply line is cleared Inspect safety equipment monthly to address any maintenance issues ensuring the equipment is in good operating condition and that there are no signs of w...

Страница 4: ...Hub Plugged Brass Sensor Body Brass Adapter and Tee 2 7 8 73mm 1 5 8 41mm NEMA 4 Junction Box and Cover Electrical Quick Disconnect Male 3 13 16 97mm 5 5 16 135mm Red Blue Black Remote Sensing 13 1 8 334mm System is prewired Installer connects ONLY ground black and white wires 1 2 eyewash or 1 drench shower NPT Inlet and Outlet 2 3 8 60mm for eyewash or 3 9 16 91mm for drench shower ...

Страница 5: ...tem may be mounted directly to the drench shower piping using the supplied U bolts and nuts The signaling system can also be bolted to a flat surface such as a wall hardware for this type of installation is NOT supplied NOTICE If the water supply line will be exposed to temperatures at or below freezing the inlet supply must be freeze protected 6 inches above the flow switch tee freeze protection ...

Страница 6: ...ng the cover counter clock wise B With the remaining conduit cable run provided electric power conduit and hubs into an unused 3 4 conduit port of the control box Connect the provided wires in the conduit to the floating terminal block per the wiring schematic Compliance and conformity to local codes and ordinances is the responsibility of the installer D Once the connections are made close the ac...

Страница 7: ...ure The signaling system is designed to work properly even if both the eyewash and drench shower are used simultaneously The signaling system will continue to operate so long as either the eyewash or drench shower is still in use Signaling System Maintenance The Bradley Emergency Signaling System is designed to be virtually maintenance free An occasional damp cloth wiping of the clear dust cover i...

Страница 8: ...from the terminal location C Remove the nut on the stem of the light which attaches it to the enclosure Remove the entire light D Remove the gasket if present to expose the four screws which retain the dome E Remove the screws take off the dome and the LED array is now visible Press and turn the LED array to remove Replace as needed with the same size LED array and color F Reverse the disassemble ...

Страница 9: ...omponent failure Check light connections and filament in the light Area light does not operate No power to the signal station Check that the circuit breaker or fuse is supplying power to the signal station Component failure Check the two 3 Amp 24VDC fuses on the print circuit board in the signal station enclosure No input power Check that there is 24VDC being supplied from the power supply mounted...

Страница 10: ... 13 2016 Bradley 215 1847 Rev A ECN 16 05 006C 30 35 84 31 32 33 34 36 34 38 76 84 36 61 34 36 33 34 20 38 77 84 61 62 63 43 41 32 33 34 36 39 34 33 34 37 35 84 3 33 35 84 2 1 64 65 60 38 84 36 81 80 62 36 S19 324D2 Service Parts ...

Страница 11: ...ameplate 43 255 070 1 Enclosure Class 1 Div 60 S70 176 1 Exp Alarm Enclosure MN heat traced units only 60 140 1157 1 Bracket Alarm Box Exp Pipe Mount non heat traced units Item Part No Qty Description 61 160 514 5 Screw 3 8 16x1 0 BTN 62 161 157 5 Nut 3 8 16x1 0 BTN 63 140 1158 1 Bracket Alarm J Box EX 64 269 594 2 U Bolt SST 65 161 065 4 Nut 3 8 16 Hex 76 269 1588 1 Conduit Flexible 3 ft 77 S90 6...

Страница 12: ...847 Rev A ECN 16 05 006C Wiring Diagram NOTES 1 Devices in dashed boxes are optional 2 All powered devices are 24VDC 3 All wires are 18 AWG unless supplied with the device then those wires are to be used 4 The flow switch is shown in the no flow state ...

Страница 13: ...AY COIL NORMALLY OPEN NORMALLY CLOSED LIGHT HORN FLOW SWITCH FLOW SENSOR COMPONENT SOLDERED WIRE LEGEND CONTACT CONTACT INTERNAL JUMPER TERMINAL BLOCK CONNECTION NORMALLY OPEN CONNECTION NORMALLY CLOSED SWITCH UNSWITCHED 24 VDC OUTPUT S83 346 S83 345 S83 344 UNSWITCHED 24 VDC OUTPUT UNSWITCHED 24 VDC OUTPUT R4 R3 ...

Отзывы: