
6
S19-322
Installation
11/21/2017
Bradley •
215-1845 Rev. B; ECN 17-05-068
2 Mount the Signaling Assembly in Wall
C
Chose a location for mounting the
signaling assembly . The signaling
assembly should be mounted at least
7 feet above ground level for best
visibility .
Recessed signaling system display needs to be installed in a location where it is not in the
direct spray pattern of a drench shower.
D
Size appropriate hole to mount the
signaling system in . The wall must
have sufficient depth to accommodate
the flush mounting of the control box .
E
Mount the control box to the in wall
studs using the holes provided and
fasteners (customer provided) .
3 Connect Signaling Assembly to Flow Switch
Make sure cable is not taut to prevent
undue stress to cable and connector.
A
Connect the flow switch to the
signaling system by plugging the
prewired cable into the socket
provided in the flow switch junction
box . The plug and socket have an
alignment pin and groove which
makes for error-free hook-up .
B
Tighten the locking collar on the
female cable socket by rotating it
clockwise after plugging in . This
makes a good watertight connection .
Prewired Cable
Flow Switch
Junction Box
Locking Collar
A
Remove the four screws on the front
panel/cover to install the control box .
B
Unplug the connector that attaches
the wire to the front panel, located
in the lower right hand corner of the
control board . Set the front panel
aside .
25
JP1
24
15
JP4
14
7
JP3
JP2
6
1
28