
U
PDX
SE
RV
I
C
E
PR
O
C
E
D
U
R
E
VIII
Gas Control Testing and
R
eplacement
U
PD
X
Se
r
ie
s
P
a
g
e
3
1
G
as
C
ont
r
ol
R
eplace
m
ent
Step 1
.
Rotate
k
nob of the gas control
to
the
“
OFF
”
p
osition
.
Step 2
.
Turn off gas supply to water heater
.
Step 3
.
Disconnect gas supply line from gas control
.
Step 4
.
Turn off water supply and drain water heater completely
.
Step 5
.
Remove the wire clip from the feedline
.
Step 6
.
Disconnect main burner feedline, pilot tube, white thermopile wire and igniter wire from gas control and bend
the main burner feedline and pilot tube out of the way
.
Also disconnect the red wire leading from the thermopile
from the red wire leading from the gas control
.
Step 7
.
Remove the gas control from the water heater by rotating counter
-
cloc
k
wise
.
It may be necessary to use a length
o
f ½
”
NPT p
i
p
e
threaded
into
the
inlet
o
f
the
gas
c
ontrol
.
Step 8
.
Install new gas control into the water heater
.
a) Install gas control into water heater by rotating cloc
k
wise
.
DO NOT use a wrench on the gas control
body or damage to the gas control may occur
.
If necessary,
use
a
length
o
f ½
”
NPT p
i
p
e
threaded
into
gas inlet of gas control
.
b) Position the main burner feedline and pilot tube bac
k
to the gas control and attach to the gas control
.
Connect the igniter wire and the white thermopile wire to the gas control
.
Connect the red wire from
the gas control to the resettable thermal switch and connect the red wire from the thermopile to the
resettable thermal switch
.
c) Gather the igniter wire, white thermopile wire and red thermopile wire near the side of the feedline
.
Use the clip that was removed in Step 5 to secure the wires to the feedline
.
d) Connect gas supply to inlet of gas control
.
Step 9
.
Resume the water supply to the water heater
.
Be sure that the tan
k
is full before operation is resumed
.
Step 10
.
Chec
k
the main burner feedline and pilot feedline for gas lea
k
s
.
Step 10
.
To resume operation follow the instructions located on the lighting instruction label or the lighting
instructions located in the installation and operation manual
.
I
g
niter
wire
P
ilot
tube
White
thermopile
wire
Main
burner
feedline
Red
Wire
Leads
Gas
Control
shown
in
the
“OFF”
position
31
Содержание UPDX series
Страница 44: ......