36
UPV Series
36
Installation of Inner Door With Gasket (cont.)
Step 5. Align right side inner door to combustion chamber and verify the fastener holes
of the combustion chamber are aligned with right side inner door slotted
opening. Verify seal integrity around combustion opening. Secure right side
inner door using ¼” hex drive screws.
DO NOT OVER TIGHTEN SCREWS
.
Verify both left and right sides of inner door are properly positioned and sealed
against the combustion chamber.
Step 6. Replace outer jacket burner access door.
Step 7. To resume operation follow the instructions located on the lighting instruction
label or the lighting instructions located in the installation and operation manual.