38
PV SERVICE PROCEDURE
XIII
Inner Door/Gasket Removal, Inspection &
Replacement
Condensing PV Series
38
Installation of Inner Door With Gasket (cont.)
Step 10.
Firmly place right side inner door flange against the left side inner door flange and
secure with (2) ¼” hex drive screws from step 3b.
DO NOT OVER TIGHTEN
SCREWS
.
Step 11.
Align right side inner door to combustion chamber and verify the fastener
holes of the combustion chamber are aligned with right side inner door slotted
opening. Verify seal integrity around combustion opening. Secure right side
inner door using ¼” hex drive screws from step 3a.
DO NOT OVER
TIGHTEN SCREWS
. Verify both left and right sides of inner door are
properly positioned and sealed against the combustion chamber.
Step 12.
Replace outer jacket burner access door.
Step 13.
To resume operation follow the instructions located on the lighting instruction
label or the lighting instructions located in the Installation & Operation manual.