![BPE Amstel 22kW Smart Скачать руководство пользователя страница 19](http://html.mh-extra.com/html/bpe/amstel-22kw-smart/amstel-22kw-smart_user-and-installation-manual_2798785019.webp)
5.4. Leakage Test
• Located just below the Emergency Shutdown Button is a small
red button which is designed to perform a Leakage Test to
ensure that there are no faults within the EV Charger.
•
When pressing this button, the MCU will control the circuit to
send out a small 10mA analog DC leakage to the Type
A
RCD to
ensure it is functioning properly.
• This action should be carried out each time you are about to
start a charging session.
15
Содержание Amstel 22kW Smart
Страница 1: ...AC EV ChargeDepot 22kW Smart Socket User Installation Manual ...
Страница 2: ......
Страница 7: ...2 1 Datasheet 2 Specification 3 ...
Страница 24: ...BE Smart App Setup 20 ...
Страница 25: ...1 App Setup 1 1 Download the BE Smart App 1 2 Open the App and select Add EV Charger 21 Android iOS ...
Страница 32: ......