![Boston Scientific Vercise Скачать руководство пользователя страница 46](http://html.mh-extra.com/html/boston-scientific/vercise/vercise_manual_2796136046.webp)
Vercise™ Deep Brain Stimulation Systems
Surgical Implant Manual
92495783-02 Page 42 of
en
4. Visually check that the DBS Lead electrodes are aligned with the Lead Extension Contacts
(Figure 31).
If they are not aligned, continue to grip the DBS Lead next to the Retention Sleeve and push to
advance the Contacts into alignment with the Lead Extension Contacts. If necessary, slightly
retract the Lead, then advance the Contacts again until proper alignment is confirmed. Do not
tighten the Setscrew in the Lead Extension Connector at this time.
When inserting either a DB-2201 or DB-2202 8 Contact Lead into an 8 Contact Extension,
the retention sleeve will no longer be visible when the lead is fully inserted. Full insertion and
alignment should be confirmed by visually checking that all contacts are aligned.
Note:
Ensure that the DBS Lead is fully inserted into the Lead Extension Connector so that
the Retention Sleeve is located under the Setscrew.
Correct
Incorrect
Figure 31. Alignment of the DBS Lead in the Lead Extension Connector
5. To connect the second DBS Lead to the second Lead Extension, see the
section of this manual and repeat Steps 1 through 5 to expose the DBS Lead. Then see
the
“Connecting the DBS Lead to the Lead Extension”
section of this manual and repeat Steps
1 through 4 to connect to the Lead Extension.
6. Do not tighten Setscrews at this time.
Note:
Any unused Lead Extension ports should be filled with a port plug. Tighten the Setscrew
on any Port Plugs.