background image

Operation

Changing the Handle Height

g397093

Figure 8

1.

Standard position

2.

Tall position

3.

Short position

5

 

Содержание WBS28080

Страница 1: ...al injury or death Preparation Ensure that only trained personnel install and perform maintenance on the equipment Always wear appropriate personal protective equipment when loading unloading and servicing the spreader Wear substantial slip resistant footwear eye protection and respiratory protection Carefully read and follow the chemical warning labels and safety data sheets SDSs for all chemical...

Страница 2: ...the axle 6 Fold the lynch pin to ensure that it will not fall out g397097 Figure 1 7 Remove the bolts securing the pivot bracket to the lower handles 8 Put the handle shaft in between the lower handles and secure with the hardware removed in Step 7 g397095 Figure 2 9 Pull the lever back to bring the control rod down to the pivot bracket 10 Remove the lower nut installed on the control rod and inse...

Страница 3: ...ontrol rod 3 Lower nut 2 Upper nut 4 Pivot rod 4 Push the control lever to the open position 5 Look in the hopper to ensure that the shut off plate is open all the way 6 Tighten the nut on the control rod 80lb spreader upper 100lb spreader lower Installing the Deflector 1 Place the clips on the deflector frame g397410 Figure 5 2 Secure the deflector pieces to the frame g397409 Figure 6 3 Secure th...

Страница 4: ...g397374 Figure 7 4 ...

Страница 5: ...Operation Changing the Handle Height g397093 Figure 8 1 Standard position 2 Tall position 3 Short position 5 ...

Страница 6: ...Notes ...

Страница 7: ......

Отзывы: