94
9. LAN Test.
The configuration of ESP is done by the Local Area Network (LAN).
Therefore LAN communication can be confirmed by the ESP and can be settled by the design
tool and that can measure it in the correct situation.
Test Limits
10. RS-232C Test.
The measurement by ATS2 macro is done using the RS232C line.
Therefore RS232C communication can be confirmed by the ESP and it can be measured in the
correct situation.
Test Limits
11. RS-485 Test.
This RS-485 test will come after above inspection.
Pass/Fail is detected by automatically.
Refer to section “4-8. About RS485 test on ATS2”.
When “EC16” could be found in the sequence of ESP setting(refer to section 4),
this test is passed.
Test Limits
12. Phantom Power Test
The test will prompt you to check to see if the A or B red LEDs on the phantom cutter PCB are
lit or not. Respond to the prompts as needed. If the LEDs are lit properly for all 8 channels, the
test will be completed.
13. Test Completion.
TEST PROCEDURES
Item Pass
Fail
LAN ATS2
macro
can
reach this item.
Cannot reach.
Item Pass Fail
RS232C ATS2
macro
can
reach this item.
Can not reach.
Item Pass
Fail
RS485
“EC16” could be found in
design tool.
Can not found.
Once all of
the tests are
completed,
the dialog box
shown below
will appear.
Click the OK button to end the test. You will
get the dialog box shown above. Click OK.
Содержание ControlSpace ESP-88
Страница 97: ...97 Figure 8 Motherboard Top Etch Layout Diagram Figure 9 Motherboard VCC Etch Layout Diagram...
Страница 98: ...98 Figure 10 Motherboard GND Etch Layout Diagram Figure 11 Motherboard Bottom Etch Layout Diagram...
Страница 100: ...100 Figure 14 MIC Line Input PCB GND Etch Layout Diagram Figure 15 MIC Line Input PCB Bottom Etch Layout Diagram...
Страница 101: ...101 Figure 16 DSP PCB Topside Etch Layout Diagram Figure 17 DSP PCB VCC Etch Layout Diagram...
Страница 102: ...102 Figure 18 DSP PCB GND Etch Layout Diagram Figure 19 DSP PCB Bottom Etch Layout Diagram...