![Bosch Worcester Greenstar Utility 32/50 Скачать руководство пользователя страница 24](http://html.mh-extra.com/html/bosch/worcester-greenstar-utility-32-50/worcester-greenstar-utility-32-50_installation-commissioning-and-servicing-instruction-manual_38678024.webp)
Installation
Greenstar Utility
ErP -
6 720 821 751 (2018/04)
24
5.4
Combustion chamber
Secondary heat exchanger:
Refer to figure 31
1. Remove the seven screws [1] securing the flue manifold access
cover [2].
▶ Check that all the baffles and retainer [3] are correctly fitted to the
secondary heat exchanger:
▶ Check there is a gap between bottom of the dip tube [4] and the flue
manifold.
Fig. 31
Combustion chamber
Refer to figure 32
2. Remove the six retaining nuts and washers [1].
▶ Remove combustion chamber access door [2]
▶ Check that the combustion chamber seal [3] is in good condition and
seated properly
3. Remove any transit packaging and ensure that the baffle [4] is
correctly fitted.
4. Refit combustion chamber door [2].
IMPORTANT
: Secure with nuts and washers [1] and tighten
gradually in a rotating sequence, as shown in figure 32.
Do not over tighten the nuts.
Fig. 32
5.5
Pipework connections
Refer to figure 33
Water connections
▶ Remove any transit bungs from the pipework connections on the
appliance.
▶ Ensure all pipework is clean.
▶ Align water pipework and connect to [1] and [2].
▶ Check that the unused socket have been capped.
Oil supply connections
▶ Route oil supply pipe [8] along the side of the appliance as required,
finishing close to the burner. Avoid hot surfaces.
▶ Connect the oil supply pipe [8] to the isolating valve [7], ensure the
valve is closed.
▶ Connect the flexible oil hose to the isolating valve [7].
Condensate connection
▶ Connect 21.5mm polypropylene pipe [4] (not supplied) to the
condensate waste pipe [5] flexible push fit connector and terminate
to waste.
▶ Do not use any solvents, adhesives or lubricants when pushing the
pipe into the rubber connector.
▶ Ensure that the condensate pipe runs away from the appliance at a
constant fall of 50mm (min.) for every metre.
▶ Seal all condensate pipe joints.
6720821751-09.1W
o
1
3
4
2
CAUTION:
Isolate the oil and water mains supply before
starting any work and follow all relevant safety
precautions.
Surplus water may be present, in the appliance, due to
factory testing.
Replace flexible hose at annual service to prevent
possible oil leakage.
4
3
2
1
6720821751-11.1Wo
1
2
3
4
6
5