![Bosch Worcester GREENSTAR 12i System Скачать руководство пользователя страница 34](http://html.mh-extra.com/html/bosch/worcester-greenstar-12i-system/worcester-greenstar-12i-system_instruction-manual_38669034.webp)
COMMISSIONING
THE COMBUSTION FOR THE APPLIANCE
IS FACTORY SET.
NO ADJUSTMENT IS REQUIRED IF THE
GAS INLET PRESSURE IS CORRECT.
CHECKING GAS INLET PRESSURE:
The inlet pressure to the appliance must be
checked using the following procedure:
SETTING THE BOILER TO MAXIMUM:
1 Press service button (F) for 10 seconds and
set temperature to maximum.
•
The service button will illuminate continually
and the blue power indicator will flash quickly.
MEASURING THE INLET PRESSURE:
2 Slacken the screw in the inlet pressure test
point and connect a manometer.
Measure the pressure with the boiler
running at maximum.
Check the gas supply working pressure at
the gas valve inlet point:
N.G. 18.5 mbar (minimum)
L.P.G. 37 mbar (minimum)
The gas rate should be measured at the
gas meter after 10 minutes operation at
maximum. See technical data section at the
front of this manual.
Ensure inlet pressure is satisfactory with all
other gas appliances working.
Replace controls cover. NOTE: This boiler is
designed with a differential of 20°C across
the heating system.
If pressure is satisfactory press the
service button (F) again and the boiler
will return to normal operation.
•
If left in the service mode the control will
return to normal operation after 15 minutes.
Re-seal the screw in the gas inlet pressure
test point.
I M P ORTANT: Do not continue
commissioning until the correct
gas pressure is achieved.
Inlet Test Nipple
A
D
F
C
B
G
E
H
I
A - On/off button
B - On/off and fault indicator (BLUE)
C - Temperature control
D - Burner indicator (GREEN)
E - Reset button
F - Service button
G - Not used
H - System pressure gauge
I - Cover or optional programmer
WHEN RUNNING IN SERVICE MODE
NOTE: When fitted with the optional
diverter valve (not supplied) and
running in service mode, the boiler
will operate both central heating and
hot water circuits.
If fitted to an S or Y plan system, the
system must only be run in central
heating mode.
COMMISSIONING
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER BOSCH GREENSTAR 12i System/24i System
8 716 107 375a (02/05)
33
C
O
M
M
ISS
IO
N
IN
G