Hydraulic connection
TSS – 6720887693 (2018/10)
20
9.1
Connecting the flow pipe
The installation of the flow pipe depends on the solar thermal system.
▶ Remove transport protection from the collector connections.
▶ Shorten the solar hose [2] as required and push with hose clips onto
the collector connection.
▶ Tighten the circlip when hose clip is located directly in front of the
bead.
NOTICE:
Leak from the storage tank connection!
The gasket can be damaged by over-tightening of the screw connection.
▶ Hand-tighten the storage tank connection pipe and then tighten with
a ½ turn using a spanner (corresponds to approx. 35 Nm).
▶ Screw the storage tank connection pipe [4] with a gasket [1] onto the
storage tank connection (solar flow).
▶ Push the solar hose [2] with hose clip [3] onto the storage tank
connection pipe.
▶ Tighten the circlip when hose clip is located directly in front of the
bead.
Fig. 51 Installing the flow pipe (system TSS200)
Fig. 52 Installing the flow pipe (System TSS150, 300)
9.2
Connecting the return pipe
▶ Push union nut [1] over the collector connection.
▶ Place clamping washer [2] behind the bead on the collector
connection and press together.
NOTICE:
Collector damage from twisted pipes!
▶ Counterhold when tightening the fittings on the angled ferrule.
▶ Push angled ferrule with O-ring [3] against the collector connection
and secure with union nut.
NOTICE:
Leak from the storage tank connection!
The gasket can be damaged by over-tightening of the screw connection.
▶ Hand-tighten the storage tank connection pipe and then tighten with
a ½ turn using a spanner (corresponds to approx. 35 Nm).
▶ Screw the storage tank connection pipe [7] with a gasket [6] to the
solar return connection.
▶ Push the long solar hose [5] with hose clip onto the angled ferrule
and storage tank connection pipe.
▶ Tighten the circlip when hose clip [4] is located directly in front of the
bead.
Fig. 53 Installing the return pipe
Installing the return pipe bracket
▶ Position the bracket at the edge of the collector so that the pipework
runs with an ascending gradient to the storage tank connection.
▶ Tighten the screws.
Fig. 54 Installing the bracket on the collector frame
4
1
3
2
0010011157-02
0010011158-01
1
2
4
3
1
2
3
4
5
0010011159-02
6 7
4
5
0010014990-01
0010014990-01
Содержание TSS Series
Страница 29: ......
Страница 30: ......
Страница 31: ......
Страница 32: ...Bosch Thermotechnik GmbH Junkersstrasse 20 24 D 73249 Wernau www bosch thermotechnology com ...