![Bosch TCE 260 Скачать руководство пользователя страница 10](http://html.mh-extra.com/html/bosch/tce-260/tce-260_operation-manual_51075010.webp)
1 987 AT7 374
2015-09-02
|
Robert Bosch GmbH
10 | TCE 260 | Installation
R
Fixed the cover then fasten the bolt.
R
Connect the air pipe, open the side panel of machine
body, then make the air pipe connect with straight
connector.
R
Assemble the bead breaker blade, then fasten the
bolt.
R
Loosen the anchor bolt, push the cross arm to the
innermost position, prepare the lifting machine.
Note: The way to lifting the machine, please refer to the
figure, please keep stable while lifting the machine(the
machine center isn’t same with the gravity center) and
protect the plastic cover from damage.
5. Installation
5.1
Installation
1.
Installation environment requirement:
Requirement
Temperature
4-40ºC
Sea level
<1000m
Humidity
50%40ºC-90%20ºC
2.
When you choose the installation position, you
should secure the safety of the machine when it runs
in the normal work condition.
3.
This machine must be connect to the main and com-
pressed air system, hence we suggest you to install
the machine near the power source.
4.
Installation position should at least leave the space
in the following figure to secure free movement of
each part of the machine.
5.
If this machine is installed outdoors, you should take
measures to prevent rain and sun. General speaking,
this machine can not be used outdoors.
en
Содержание TCE 260
Страница 1: ...TCE 260 操作手册 拆胎机 zh en Operation manual Tyre changer ...
Страница 2: ...1 987 AT7 374 2015 09 02 Robert Bosch GmbH 2 TCE 260 2TCE 260 ...
Страница 3: ...1 987 AT7 374 2015 09 02 Robert Bosch GmbH TCE 260 3 Contents English 4 目录 中文 23 ...
Страница 42: ......
Страница 43: ......