Moving and Storage
|
5
Revised 08/14
8 733 914 818 (2014/08)
SV Heat Pump Series
SV series units are offered with a wide range of
factory installed options including: PSC, constant
torque ECM or constant air flow ECM fan motors,
hot gas reheat, tin plated air coils, on board DDC
controls, copper or cupro nickel water coils and
more.
On board safety features will protect the major
unit components from damage under most
foreseeable installation and operation problems.
MOVING AND STORAGE
If the equipment is not needed for immediate
installation upon arrival at the job site, it should be
left in its packaging and stored in a clean, dry area.
Units must be moved and stored in the normal
upright position at all times.
Use caution to avoid damage to filter racks and
duct flanges when storing or handling units.
INITIAL INSPECTION
Be certain to inspect all cartons or crates on each
unit as received at the job site before signing the
freight bill. Verify that all items have been received
and that there is no visible damage. Note any
damage or shortage on all copies of the freight bill.
In the event of damage or a shortage it is the
responsibility of the purchaser to file the
necessary claims with the carrier. Concealed
damage not discovered until after removing the
units from packaging must be reported to the
carrier within 24 hours of receipt.
LOCATION
Locate the unit in an indoor area that allows easy
access to the filter, front access panel and blower
access panel, and has enough room for service
personnel to perform maintenance and repair
work. Provide sufficient room to make fluid,
electrical and duct work connections.
Locate the unit in conditioned space and avoid
installation in corrosive environments.
If the unit is installed in a confined space, such as
a closet, provisions must be made for return air to
freely enter the face of the unit’s air coil.
Unit condensate drains are not internally trapped.
Allow room below the unit base for horizontal and
counter flow models for an adequate condensate
trap.
Some options are offered in limited sizes and/or
voltages.
NOTE:
Never lift or move units by filter
racks, external piping or attached options/
accessories.
NOTE:
Never stack units when
transporting them.
NOTE:
When storing units:
Do not stack units larger than 6 tons
capacity!
Do not stack vertical or counter flow units
under 6 tons capacity more than 2 high
Do not stack horizontal units 6 tons capacity
more than 3 high
NOTE:
Do not locate the unit above supply
piping.
Do not locate the unit in areas subject to
freezing or in areas subject to temperature
or humidity extremes.
NOTE:
SV series packaged units are not
approved for outdoor installation. Units
must be installed in conditioned space that
is not subject to extremes of temperature or
humidity to avoid cabinet sweating and/or
equipment damage.
NOTE:
Do not use SV series units for
temporary heating, air conditioning or
ventilation during construction, especially
when plastering, sanding or painting. Care
should be taken to avoid introduction of
dust, paint or debris into the air coil.
Содержание SV007
Страница 53: ...Notes 53 Revised 08 14 8 733 914 818 2014 08 SV Heat Pump Series NOTES ...
Страница 54: ...54 Notes SV Heat PumpSeries SV Heat Pump Series 8 733 914 818 2014 08 Subject to change without prior notice ...
Страница 55: ...Notes 55 Revised 08 14 8 733 914 818 2014 08 SV Heat Pump Series ...