en | Optical alignment
Photobeam 5000
1.
Turn off the transmitter Function switch 6.
2.
Follow steps 2 and 3 as listed in the Level LED – alignment of the Upper Beam
procedure. If
LED turns off, alignment is complete.
1
Figure 8.2: Level LED
Callout
﹘
Description
1
ー
Receiver LED console
Notice!
Turn on Function switches 1 and 2 of the transmitter after finishing the alignment to verify the
monitor LEDs light up once every 3 seconds.
Volt meter alignment
Insert the volt meter leads into the alignment check terminals of the receiver to check voltage.
If the value is 3.0 V or higher, the adjustment is completed. If less than 3.0 V, adjust the
receiver and transmitter until 3.0 V is obtained.
Notice!
In an ideal environment, the voltage is 3.0 VDC or above.
1
Figure 8.3: Volt meter alignment
Callout
﹘
Description
1
ー
Alignment check terminals
2016.02 | 03 | F.01U.303.478
Installation and Operation Guide
Bosch Security Systems, Inc.
Available from A1 Security Cameras
www.a1securitycameras.com email: [email protected]
Содержание ISC-FPB1-W120QF
Страница 2: ...Available from A1 Security Cameras www a1securitycameras com email sales a1securitycameras com ...
Страница 42: ...Available from A1 Security Cameras www a1securitycameras com email sales a1securitycameras com ...
Страница 43: ...Available from A1 Security Cameras www a1securitycameras com email sales a1securitycameras com ...