6 720 680 226
Installation instructions
23
Fig. 24 Gas connection
Once connections are made, check for gas leaks at all
joints. Apply some gas leak detection solution to all gas
fittings. Bubbles are a sign of a leak. A combustible gas
detector may also be used to detect for leaks.
GAS LINE SIZING
The gas supply piping for a single heater should be
sized for a maximum draw of 195,000 BTUH. Measure
the length of gas supply line from the building's gas
main to the heater and use the tables in Fig. 26, page
24 or the gas line manufacturer’s sizing tables to
determine the pipe diameter necessary. If there are
more gas drawing appliances on the line, size the gas
line according to the total maximum amount of BTU
draw input rating of for all appliances combined.
Note:
Undersizing the gas line may result in diminished
hot water flow rate and temperature. See chapter 3.13,
page 28 for the procedure to measure gas pressure.
Proper gas pressure must be confirmed at time of
installation.
Fig. 25
Danger:
If you have a leak, shut off the
gas. Tighten appropriate fittings to stop
leak. Turn the gas on and check again
with a gas leak detection solution.
Never test for gas leaks using a match
or flame.
Gas supply
Cap
Minimum
3”
Gas piping
Inlet gas particle screen
(included)
Содержание Integra 500
Страница 50: ...6 720 680 226 50 Integra 500 Functional scheme 11 Integra 500 Functional scheme Fig 69 Functional scheme ...
Страница 52: ...6 720 680 226 52 Interior components diagram and parts list Fig 71 Appliance overview 6720680226 01 1Av ...
Страница 62: ...6 720 680 226 62 Limited Warranty ...
Страница 63: ...6 720 680 226 Limited Warranty 63 ...