Installation instructions
29
Greentherm T9900 SE/i – 6 720 813 635 (2019/03)
Fig. 15
Horizontal venting installation air intake piping not
shown)
[1]
Termination
[2]
Water heater
[3]
Elbow
[4]
Horizontal run should slope ¼" per foot upwards to water
heater
[LA] 12 inches (305 mm) (18 in. for Canada) above maximum
snow level or at least 24 inches (610 mm), whichever is
greater
NOTICE:
▶ Place pipe supports every 5 feet (1525mm) of horizontal
and vertical run, beginning with support near water heater.
▶ Periodic cleaning of the vent terminal and air intake screens
is mandatory.
▶ Avoid locating vent terminals near equipment, vegetation,
plants or building features which can be subject to
degradation from exhaust gases.
Fig. 16
Horizontal venting system (sealed combustion)
[1]
Intake
[2]
Exhaust
Fig. 17
Vent and air intake pipe position of a sealed
combustion system
[1]
Intake
[2]
Exhaust
[X]
At least 1foot (305mm)