6 720 643 259 (2010/05)
Commissioning (installers only)
|
15
US/CA
4
Commissioning (installers only)
B
Specify heating circuit number for the coding
of the FB 100 and IPM 2.
–
For a heating system with FW 200 a
heating circuit from HC
1
to HC
4
with
associated coding 1, 2, 3 or 4 is allowed.
B
Set the DIP switch on the IPM 2 according to
the assigned heating circuit.
B
Switch on the system.
During first commissioning or after a global reset
(resetting all adjustments):
B
Turn
to select the language and press
to confirm.
B
Only one FB 100 can be assigned per heating
circuit and per code. Select
ID heating circuit
with
and confirm with
.
B
On commissioning, the automatic system
configuration is started (wait 60 seconds and
follow the instructions shown).
B
Set time and date for the FB 100 on the
outdoor reset controls.
B
Adjust other settings to suit the specifics of
the system,
Æ
and Section 8 starting on page 32.
Description of the controls
Æ
page 2.