introduced to the space will be unfi ltered and 
unconditioned; potentially leading to moisture 
concerns.

8.   An air balance calculation should be conducted 

to verify that there is not a negative pressure 
being created. The amount of outside air being 
introduced should be adjusted to provide a 
positive pressure within the building if it is found 
to be negative.

9.   The damper should be in a position that allows 

for easy maintenance and inspection.

10.  The motorized damper is intended to be 

installed in a conditioned space, not outdoors 
exposed to the elements.

11.  It is recommended to insulate the outside air 

duct within the conditioned space to prevent 
condensation forming in cold weather climate 
conditions.

12.  The height of the hooded louver intake should be 

considered as well. The higher above grade the 
intake is located, the better quality of fresh air 
that is available. The minimum distance above 
grade should be 2' (24").

InSTAllATIon

The fresh air duct system can be installed once the 
above mentioned installation concerns have been 
considered, the installation location of the intake 
louver and the routing of the duct has been 
determined.
1.   Install the damper in the chosen location. The 

orientation of the damper should follow the air 
fl ow direction label. The crimped end should be 
oriented towards the air handler. Support the 
damper with two metal duct straps; the weight 
of the damper should not be supported by the 
duct work.

2.   Ensure that the actuator motor is positioned on 

the side and not the top of the duct when 
installing in a horizontal position.

3.   Drill or cut the required diameter hole through 

the exterior wall for the intake hood and duct.

4.   Securely fasten the hooded louver intake to the 

exterior wall.

Installation 

IAQ Series  5

5.   Route the required sized duct as determined by 

the HVAC contractor or professional engineer 
from the louver intake duct connection to the 
damper.

6.   Route the required sized duct as determined by 

the HVAC contractor or professional engineer 
from the damper to the connection location to 
the HVAC system return air duct.

7.   Ensure that the bird screen is installed securely 

in the hooded louver and that there are no 
gaps.

Caution

The duct installation, sizing, supporting, and 
sealing should be conducted following the 
latest SMACNA standards or following more 
stringent local codes.

WIrIng

The motorized damper motor is controlled by a 24 
VAC wall mounted, variable position potentiometer 
switch. The wall controller has 3 wire leads to make 
connections. Follow the wiring schematic shown in 
Figure 2 on the next page.
1.   Choose an appropriate location to mount the 

wall controller. Available wall cavity space and 
ease of access to the wall cavity space should 
be considered when choosing an installation 
location.

2.   Route an 18 AWG size wire from the air handler 

from the “G” terminal and connect to the “G” 
connection the damper actuator motor.

3.   Route an 18 AWG size wire from the air handler 

from the “R” terminal and connect to the “24 
VAC” connection the damper actuator motor.

4.   Route an 18 AWG size wire from the air handler 

from the “C” terminal and connect to the 
“COM” connection the damper actuator motor.

5.   Route an 18 AWG size wire from the “COM” 

connection on the damper actuator motor to 
the black wire lead out of the wall controller 
and connect using a wire nut.

6.   Route an 18 AWG size wire from the “+5” 

connection on the damper actuator motor to 
the red wire lead out of the wall controller and 
connect using a wire nut.

Содержание FADB-04007-6--A

Страница 1: ...Installation and Maintenance Manual IAQ Series FADB 04007 6 A FADB 05011 6 A FADB 06015 6 A 6720220345 Revised 07 12 Fresh Air Damper System ...

Страница 2: ...le of Contents Product Information 3 Features 3 Specifications 3 Application 3 Installation Considerations 4 Installation 5 Wiring 5 Controlling the Outside Air Damper 6 Homeowner Considerations 6 Contact your local Bosch Dealer or Installing Contractor for product support 7 Product Limited Warranty 8 ...

Страница 3: ...nd routing of the air duct Figure 1 shows in general how to proDuCT InformATIon The Bosch fresh outside air damper system allows fresh air to be introduced into the home for natural healthy ventilation As the building codes of residences are getting more restrictive on air leakage for energy efficiency improvements fresh air can only enter the house as doors and windows are opened This typically l...

Страница 4: ... and Bosch recommends that a qualified HVAC contractor or a professional engineer size the duct and verify that the additional pressure drop will not adversely affect the air flow delivered by the HVAC fan motor 3 The routing of the spiral duct must be considered Length of duct as well as any fittings will provide excess pressure drop to the HVAC duct system this may adversely affect the fan motor o...

Страница 5: ... hole through the exterior wall for the intake hood and duct 4 Securely fasten the hooded louver intake to the exterior wall Installation IAQ Series 5 5 Route the required sized duct as determined by the HVAC contractor or professional engineer from the louver intake duct connection to the damper 6 Route the required sized duct as determined by the HVAC contractor or professional engineer from the...

Страница 6: ...Simply turn the knob to the appropriate amount of outside air If the percentage of air is adjusted for a short time duration due to activities or possibly by smoke being created by burning food ensure that the controller is returned to the initial setting once the situation is back to normal Leaving the damper wide open when it is not needed can lead to IAQ issues by introducing humid air or dry a...

Страница 7: ...ocation 3 Routinely check the bird screen underneath the hooded louver intake to ensure that there is not debris blocking the air flow Contact your local Bosch Dealer or Installing Contractor for product support Field Technical Support 954 776 5471 Monday Friday 8 am 5 pm EST Bosch 601 N W 65th Ct Ft Lauderdale FL 33309 www bosch climate us Contact your Local Bosch Dealer IAQ Series 7 Table 1 Repl...

Страница 8: ...sts for removal reinstallation repair and replacement of the defective component or part 7 Electricity or fuel costs or any increases or unrealized savings in same for any reason whatsoever 8 Damage caused by excessive temperatures or pressures fuel or gas explosion electrochemical reaction water and air impurities electrical failures use during construction flooding or acts of God 9 Any damage or...

Страница 9: ...PERSONS OR PROPERTY OR DAMAGES FOR LOSS OF USE LOST PROFITS INCONVENIENCE OR LOSS OF TIME Caution Note that any repaired or replaced product will be warranted for only the unexpired tem of the original warranty Caution Some states do not allow the exclusion of limitation of damages or limitations on how long an implied warranty lasts so the above limitations and exclusions may not apply to you WAr...

Страница 10: ...Subject to change without prior notice Revised 07 12 6 720 220 345 10 IAQ Series Notes ...

Страница 11: ...6 720 220 345 Revised 07 12 Subject to change without prior notice Notes IAQ Series 11 ...

Страница 12: ...601 N W 65th Court Ft Lauderdale FL 33309 Phone 954 776 5471 Fax 954 776 5529 www bosch climate us ...

Отзывы: