6 720 820 872 (2016/12)
CR 400 | CW 400 | CW 800
20 | Commissioning
9. Commissioning the C 400/C 800 user interface
(
Æ
Chapter 5.2, page 20)
10. Commissioning the system with the user interface
(
Æ
Chapter 5.3, page 20)
11. Check and, if necessary, adjust the settings in the service
menu of the C 400/C 800 user interface and perform
configuration (e.g. solar) (
Æ
Chapter 5.4, page 23)
12. Remedy warning and fault displays, if necessary, and reset
fault history
13. Fill in commissioning reports
(
Æ
Chapter 10 from page 53 and operating instructions)
14. System handover (
Æ
Chapter 5.7, page 23).
5.2
General commissioning of the user interface
The adjustment is performed according to the description in
the operating instructions, if necessary also through direct
time correction.
5.3
System commissioning with the
configuration wizard
The configuration wizard automatically recognises which BUS
nodes are installed in the system. The configuration wizard
adjusts the menu and the factory defaults.
The system analysis may take up to one minute.
After the configuration wizard has performed the system
analysis, the
Commissioning
menu is opened. The sub-menus
and settings must always be checked here and, if necessary,
adjusted and finally confirmed.
If the system analysis is skipped, the
Commissioning
menu is
opened. The sub-menus and settings listed here must be
carefully adjusted according to the installed system. Finally,
the settings must be confirmed.
For further information on the settings refer to Chapter 7 from
page 24.
&
Setting language
▶ Turn the selector to select a language and
press the selector.
Setting the date
▶ Turn the selector to set the day, month and
year.
Continue
is highlighted.
▶ If the date is set correctly, press the selector
to apply the date.
Setting the time
▶ Turn the selector to set the hours and the
minutes.
Continue
is highlighted.
▶ If the time is set correctly, press the selector
to apply the time.
&
Low loss header
▶ Turn the selector to set whether a low loss
header is installed (temperature sensor
Æ
Tab. 9) or not (
No low-loss header
).
System configuration
▶ Turn and press the selector to start (
Yes
) or
to skip the configuration wizard (
No
).
▶ When the configuration wizard is started, the
user interface automatically recognises
which BUS nodes are installed in the system
(system analysis) and adjusts the menu and
the factory defaults to the current system.
▶ Perform system commissioning
(
Æ
Chapter 5.3).
Table 8 General settings at commissioning
Содержание CR 400
Страница 63: ...6 720 820 872 2016 12 CR 400 CW 400 CW 800 63 Notes ...
Страница 64: ......