
Inspection and maintenance
43
Condens 7000 F – 6720871560 (2019/11)
11.12 Refitting detached parts
▶ Refit all parts of the floor standing boiler that have been removed for
inspection and maintenance purposes in the reverse order of removal.
▶ Insert new gaskets when assembling the air/gas ratio control valve.
Make sure they are seated correctly.
▶ Connect the compensation line and secure with hose clip.
NOTICE:
Material damage due to incorrect or unconnected compensation line!
If the wrong compensation line is used or if it is connected incorrectly,
this can cause overheating of the burner and unhygienic combustion.
▶ Connect the compensation line correctly.
▶ Check all gaskets for wear and damage.
CAUTION:
Material damage and leaks due to power transmission!
▶ When removing and installing the gas pipe, counterhold to avoid
subjecting other components to stress.
CAUTION:
Danger to health due to incorrect fan or venturi!
If an incorrect fan or venturi is installed, this can lead to higher
emissions.
▶ Fit a suitable fan for the installed burner.
▶ Fit a suitable venturi for the installed burner.
▶ Perform tightness test and emission measurement.
Starting torques:
Gas pipe union nut 1": 45 Nm
Gas pipe union nut 11/8": 52 Nm
Screws M5x16 on air/gas ratio control valve flange: 4.75 Nm
Observe the specified replacement interval for gaskets
(
▶ Replace gaskets if required.
▶ Reconnect electrical push fit connections.
▶ During commissioning, make sure that the fan is not covered.
11.12.1 Fitting the gas line to the gas valve
▶ Insert a new O-ring into the gas valve flange.
▶ Secure the flange of the gas connection again to the gas valve using
4 screws.
11.12.2 Refit the combustion air connector.
▶ With room sealed operation, plug the combustion air hose onto the
adapter and secure with the hinged pipe clip (
11.13 Check for leaks during operation
NOTICE:
Risk of material damage due to a short circuit!
▶ Cover fan electronics, burner control unit and other points at risk
before carrying out the leak test.
▶ Do not spray leak detector onto cable routing, plugs or electrical
connecting leads or allow it to drip onto them.
▶ Start the floor standing boiler and check tightness of all gaskets
under full load using a leak detection agent.
▶ Further checks of the tightness of the entire gas path
(
Chapter 7.16, page 30).
11.14 Checking the ionisation current
To ensure trouble-free operation, the ionisation current at partial and full
load (when flame is lit) must be at least 10 μA.
▶ To test the ionisation current, observe the corresponding technical
documentation for the control unit.
11.15 Completing inspection and maintenance
11.15.1 Removing measuring devices
Observe corresponding technical documentation for the control unit and
user interface.
11.15.2 Installing casing parts
▶ Fit all casing sections (
11.15.3 Checking the gas/air ratio
▶ Measure carbon dioxide content (
Chapter 11.6, page 35).
11.15.4 Confirming inspection and maintenance
▶ Sign the inspection and maintenance protocol in this manual
(
Chapter 17.7).