![background image](http://html.mh-extra.com/html/bosch/bpt-s-5-hybrid/bpt-s-5-hybrid_installation-manual_44840264.webp)
Storage system
| Installation manual
Bosch Power Tec GmbH
DO_IA_2013
_HYB_A_3ENG_AB
o
17.01.2014
120 | Commissioning
English
En
g
lis
h
▶
Procedure
1. Press
Yes
to continue commissioning.
A window opens displaying the message that the
settings have been applied by the storage system.
2. Press
OK
■
Commissioning is completed.
After successfully commissioning the device, the start
window of the storage system opens. Please refer to
the separate instruction manual for information on
how to adjust further settings in the storage system
or how to query data.
8.9:
Storage system start window