Commissioning
|
43
6720817513 (2021/09)
BH/B/B...M/B...ER/BS...ER/BH...ERZ/BHS...ERZ
6
Commissioning
Commissioning must be performed by an authorised contractor.
▶ Check the tightness of all connections (
▶ Commission all assemblies and accessories as specified in the
manufacturer's technical documents.
7
Shutdown
▶ If an immersion heater has been installed (accessory), isolate the
buffer cylinder from the power supply.
▶ Switch off the temperature controller at the control unit.
▶ Fully drain the buffer cylinder.
▶ Shut down all assemblies and accessories of the heating system as
specified in the manufacturer's technical documentation.
▶ Open the system drain valve.
▶ For ventilation, open the air vent valve. The air vent valve is located at
the top of the cylinder (
▶ Close the shut-off valves.
▶ Depressurize the heat exchanger.
▶ Drain and blow out the heat exchanger.
To prevent corrosion:
▶ Leave the connector pipes open, so that the interior can dry out well.
8
Environment/disposal
Environmental protection is a key commitment of the Bosch Group.
Quality of products, efficiency and environmental protection are equally
important objectives for us. All legislation pertaining to the
environmental protection is strictly observed. To protect the
environment we use the best possible technology and materials, subject
to economic considerations.
Packaging
Where packaging is concerned, we participate in country-specific
recycling systems that ensure optimum recycling. All of our packaging
materials are environmentally compatible and can be recycled.
Used appliances
Old appliances contain materials that should be recycled.
The relevant assemblies are easy to separate and all plastics are
identified. In this way the individual assemblies can be easily sorted and
directed to recycling or disposal.
9
Service work
With buffer cylinders, apart from visual checks, no particular
maintenance or cleaning work is necessary.
▶ Check all connections externally for leaks once a year.
▶ In the event of a fault, contact an approved contractor or the
customer service.
10
Data Protection Notice
We,
Bosch Thermotechnology Ltd., Cotswold Way,
Warndon, Worcester WR4 9SW, United Kingdom
process product and installation information,
technical and connection data, communication data,
product registration and client history data to provide
product functionality (art. 6 (1) sentence 1 (b)
GDPR), to fulfil our duty of product surveillance and for product safety
and security reasons (art. 6 (1) sentence 1 (f) GDPR), to safeguard our
rights in connection with warranty and product registration questions
(art. 6 (1) sentence 1 (f) GDPR) and to analyze the distribution of our
products and to provide individualized information and offers related to
the product (art. 6 (1) sentence 1 (f) GDPR). To provide services such
as sales and marketing services, contract management, payment
handling, programming, data hosting and hotline services we can
commission and transfer data to external service providers and/or
Bosch affiliated enterprises. In some cases, but only if appropriate data
protection is ensured, personal data might be transferred to recipients
located outside of the European Economic Area. Further information are
provided on request. You can contact our Data Protection Officer under:
Data Protection Officer, Information Security and Privacy (C/ISP),
Robert Bosch GmbH, Postfach 30 02 20, 70442 Stuttgart, GERMANY.
You have the right to object, on grounds relating to your particular
situation or where personal data are processed for direct marketing
purposes, at any time to processing of your personal data which is based
on art. 6 (1) sentence 1 (f) GDPR. To exercise your rights, please contact
us via
To find further information, please
follow the QR-Code.
NOTICE:
Risk of system damage from excessive pressure.
▶ Observe the maximum operating pressure
(
DANGER:
Risk of scalding from hot water!
▶ Allow the buffer cylinder time to cool down sufficiently
after being shut down.
NOTICE:
Cylinder damage from frost!
If there is a risk of frost when you are away from home,
we recommend the following:
▶ Leave the buffer cylinder operational.
or
▶ Take the buffer cylinder out of operation and drain it.
Содержание B 1000-6 ER
Страница 63: ...Andmekaitsedeklaratsioon 63 6720817513 2021 09 BH B B M B ER BS ER BH ERZ BHS ERZ 9 10 11 ...
Страница 66: ...66 Andmekaitsedeklaratsioon BH B B M B ER BS ER BH ERZ BHS ERZ 6720817513 2021 09 20 21 22 ...
Страница 67: ...Andmekaitsedeklaratsioon 67 6720817513 2021 09 BH B B M B ER BS ER BH ERZ BHS ERZ 23 6 720 806 606 13 1ITL ...
Страница 75: ......
Страница 76: ...Bosch Thermotechnik GmbH Junkersstrasse 20 24 D 73249 Wernau www bosch thermotechnology com ...