ACS 553, ACS 563 Service Manual
1 689 975 295
2021-04-13
Robert Bosch GmbH
90
Plumbing and Mechanical
Figure 4-15. Charge
CHARGE PROCESS
During the Charge process, the end user may select either high-side charge, low-side charge, or both. When the
charge process gets close to the programmed weight, the unit slows down. The unit charges by compensation and
will prompt the user in completing the charge.
Temp. Sensor
Filter / Drier
Oil Inject
HS Inlet 2
LS Inlet 2
Vacuum
Solenoid
Valve
Recover
Solenoid
Valve
High Side
Service Hose
Vacuum Pump
Compressor
Internal
Tank
High
Pressure
Switch
High
Side
Gauge
Oil Drain
Bottle
Low Side
Service Hose
Oil Drain
Solenoid
valve
Manifold
Low Side
Press
Transducer
Pressure
Relief
(S11)
(S9)
(S8)
(COMP)
(PUMP)
(P1)
(M2)
Low
Side
Gauge
(M1)
(T2)
(T1)
Oil Inject
Bottle
Solenoid
valve
(S14)
(VU1)
(V2)
System Oil
Separator
(F2)
Tank
Check
Valve
(P3)
Service
Port
Oil Inject
Check Valve
(VU4)
Solenoid
valve
Solenoid
valve
Accum
Press
Transducer
(P2)
Air Purge
Solenoid
Valve
(S6)
Air
Diffuser
Contamination
Port
HS Inlet 1
Solenoid
Valve
(S5-1)
LS Inlet 1
Solenoid
Valve
(S4-1)
(S5-2)
(S4-2)
(T3)
(T4)
Tank Liquid
Solenoid
valve
(S7)
Recover Check
Valve
(VU3)
High Side
Flush
Low Side
Flush
Flush Port
Check Valve
(VU5)
Tank Liquid Check
Valve
(VU2)
Manifold
Oil
Return
Solenoid
Valve
(S13)