![Bosch ACS 553 Скачать руководство пользователя страница 20](http://html.mh-extra.com/html/bosch/acs-553/acs-553_service-manual_50397020.webp)
ACS 553, ACS 563 Service Manual
1 689 975 295
2021-04-13
Robert Bosch GmbH
20
Introduction
Figure 1-10. Calibration check kit installation
Calibration check kit installation
(optional)
For the magnet installation, refer to Figure 1-10.
1. Plug the magnet (1) within the housing
underneath the machine base.
For fix the calibration weight, refer to
“Calibration check” in this section.
1
Refrigerant conversion kit
WARNING: Disconnect the unit from
the power source before beginning
service work. Incorrect use or
connections can cause electrical
shock.
WARNING: Wear safety goggles
when working with refrigerants.
Refrigerants can cause eye injury.
WARNING: Use extreme caution
when disconnecting hoses.
Pressurized refrigerant may be
present in hoses. Point hoses away
from you and anyone nearby.
For the conversion kit installation follow
instructions hereby:
1. Call up the Main Menu.
2. Select
NEXT
icon.
3. Select
MENU
icon.
4. Select
Maintenance
"
Service menu
and
enter password then select
OK
icon.
5. Select
AC unit emptying
and select
OK
icon to start the function.
NOTE:
To empty the A/C unit make use of a
second recovery machine with same refrigerant
and suitable free capacity.
6.
Connect the two A/C units as indicated on
display. Turn on the recovery unit and select
OK
icon.
7. Start the recovery function from the recovery
unit.
NOTE:
In case of recovery machine without
deep-recovery capabilities, perform vacuum for
definitive emptying.
8.
Disconnect the recovery machine and
connect hoses as indicated at display.
9. Select
OK
icon to start the vacuum function.
NOTE:
The A/C unit can move to the second
step “Convert unit refrigerant” only if previous
“AC unit emptying” has been completed
successfully.