36
6
‐
S11
‐
#8
X
2"
W.S
gussets
Notice
Bar
overhangs
5/8"
in
front
of
HARDWARE
Attach Bar Frame
PG 21
Hardware
D:
Place Bar Frame on top of both (516) Bar Gussets so (510) Bar Back faces inwards and (501) Front Back
Shelf faces out. (501) Front Back Shelf and (510) Bar Back overhangs the gussets by 5/8”. Attach each (512)
Side Joist to each (528) Panel Post with three #8 x 2” Wood Screws per joist. (fig. 14.2 and 14.3)
6
‐
S11
‐
#8
X
2"
W.S
gussets
Notice
Bar
overhangs
5/8"
in
front
of
HARDWARE
Attach Bar Frame
PG 21
5/8”
#8 x 2” Wood Screw x
3 per joist
(501) Front
Back Shelf
(512) Side
Joist
(512) Side
Joist
(512) Side Joist
(516) Bar
Gusset
(516) Bar
Gusset
(516) Bar
Gusset
(528) Panel
Post
(528)
Panel
Post
Fig. 14.2
Fig. 14.3
Step 14: Bar Assembly - Bar Frame
Part 2
(501) Front
Back Shelf
(510) Bar Back
6 x #8 x 2” Wood Screw
(510) Bar
Back
5/8”
Содержание CHARLESTON PERGOLA YM11762
Страница 44: ...44 support borrowedspaces com NOTES...
Страница 45: ...45 support borrowedspaces com NOTES...