3. Install the water tank
4. Install the funnel
2. Put on the water tank
1.Intall the boiler cover
06
05
1. Combine the upper and lower parts first
2. Mixing chamber is docked with the
fuselage
Install the boiler cover. After installa-
tion, firmly press down on the boiler
cover.
Install the water tank. Secure the
water tank in the card slot of the
machine to stabilize the water tank.