26
Manual version: 2.00/May 2016
Manual rev.:
2
D
o
k
u
m
e
n
ta
c
e
s
tr
o
je
D
o
k
u
m
e
n
ta
ti
o
n
d
e
r
M
a
s
c
h
in
e
n
M
a
c
h
in
e
d
o
c
u
m
e
n
ta
ti
o
n
Sa
fe
ty
n
o
te
s
2.5.
Activation of the machine
2.5.1.
Machine working conditions
Keep the conditions of the manufacturer for machine operation! If the
recommendations are not kept, damage can occur to the machine.
The manufacturer warrants the correct function of the machine for these
conditions:
•
At air temperature from 10°C to 40°C; the temperature average during 24
hours must not exceed 35°C.
•
At relative dampness of the air in the interval from 30% to 95% (not
condensing). Altitude up to 1000 meters.
•
Do not expose the machine to any radiation (microwave radiation, ultra-
violet radiation, laser radiation, x-ray radiation). Radiation can cause
problems with the machine function and deteriorate the condition of the
insulation.
2.6.
Band saw unpacking and assembling
Remove the wrapping from the machine and unpack all parts.
If the hydraulic unit is outside the machine (only connected o the machine by
hoses and cables), it needs to be placed and mounted to a solid basis (floor,
etc.). The mounting holes are located on the bottom (feet) of the tank.
2.6.1.
Machine installing and leveling
Check the floor supporting capacity before installing the machine. If the floor
capacity does not meet the requirements, you must ready a necessary base
for the machine.
Minimal requirement:
machine weight –
PR1247 SV 330 DGH – 380 kg
+ weight of the accessories
+ maximum weight of material
•
The machine must be leveled horizontally. All feet of the machine must
touch the floor after leveling.
•
The machine must be leveled by means of a calibrated spirit level. Put the
spirit level on the loading surface of the vice. Adjust the roller conveyors
according to the spirit level.
•
For machine leveling, take care that there is sufficient space available for
operation, repair work, servicing of the machine and handling of the
material.
Attention!
Switch off the main switch and lock it in position,
before you start the assembly! Otherwise, there is a
possibility of accidental machine starting.
Attention!
If the ambient temperature drops below 15 ˚ C it is
required to switch on the electromotor of the
hydraulic unit for 10 minutes and then move all the
hydraulic cylinders through the entire lifting range
before operation(for example in manual mode). The
reason being is primarily warming up the hydraulic oil
to working temperature so that the pressure switches
and throttle valves function properly.
Содержание SV 330 DGH
Страница 4: ...4 Manual version 2 00 May 2016 Manual rev 2...
Страница 8: ...8 Manual version 2 00 May 2016 Manual rev 2 Bezpe nostn pokyny Sicherheitshinweise Safety notes...
Страница 17: ...17 Bezpe nostn pokyny Sicherheitshinweise Safety notes...
Страница 19: ...19 Dokumentace stroje Dokumentation der Maschinen Machine documentation...
Страница 36: ...36 Manual version 2 00 May 2016 Manual rev 2 Ovl d n stroje Bedienung der Maschine Machine control...
Страница 45: ...45 dr ba stroje Wartung Machine service 4 dr ba stroje Machine maintenance Wartung...
Страница 46: ...46 Manual version 2 00 May 2016 Manual rev 2 dr ba stroje Wartung Machine service...
Страница 64: ...64 Manual version 2 00 May 2016 Manual rev 2 dr ba stroje Wartung Machine service...
Страница 65: ...65 Z vady Troubleshooting St rungen 5 Z vady Troubleshooting St rungen...
Страница 66: ...66 Manual version 2 00 May 2016 Manual rev 2 Z vady Troubleshooting St rungen...
Страница 73: ...73 Z vady Troubleshooting St rungen...
Страница 74: ...74 Manual version 2 00 May 2016 Manual rev 2 Sch mata Schemas Schematics 6 Sch mata Schemas Schematics...
Страница 75: ...75 Sch mata Schemas Schematics...
Страница 77: ...77 Sch mata Schemas Schematics...
Страница 78: ...78 Manual version 2 00 May 2016 Manual rev 2 Sch mata Schemas Schematics...
Страница 79: ...79 Sch mata Schemas Schematics...
Страница 80: ...80 Manual version 2 00 May 2016 Manual rev 2 Sch mata Schemas Schematics...
Страница 81: ...81 Sch mata Schemas Schematics...
Страница 82: ...82 Manual version 2 00 May 2016 Manual rev 2 Sch mata Schemas Schematics...
Страница 83: ...83 Sch mata Schemas Schematics...
Страница 84: ...84 Manual version 2 00 May 2016 Manual rev 2 Sch mata Schemas Schematics...
Страница 85: ...85 Sch mata Schemas Schematics 6 2 Hydraulick sch ma Hydraulisches Sch ma Hydraulic diagram...
Страница 87: ...87 Sch mata Schemas Schematics...
Страница 89: ...89 7 1 Pila p sov Bands ge Bandsaw...
Страница 90: ...90 Manual version 2 00 May 2016 Manual rev 2 7 2 Kusovn k St ckliste Piece list Pila p sov Bands ge Bandsaw...
Страница 91: ...91 7 3 Pila p sov Bands ge Bandsaw...
Страница 92: ...92 Manual version 2 00 May 2016 Manual rev 2 7 4 Kusovn k St ckliste Piece list Pila p sov Bands ge Bandsaw...
Страница 93: ...93 7 5 Podstavec Untersatz Base...
Страница 94: ...94 Manual version 2 00 May 2016 Manual rev 2...
Страница 95: ...95 7 6 Voz k Wagen Cart...
Страница 96: ...96 Manual version 2 00 May 2016 Manual rev 2 7 7 Kusovn k St ckliste Piece list Voz k Wagen Cart...
Страница 97: ...97 7 8 Sv r k Schraubstock Vice...
Страница 98: ...98 Manual version 2 00 May 2016 Manual rev 2 7 9 Kusovn k St ckliste Piece list Sv r k Schraubstock Vice...
Страница 99: ...99 7 10 Rameno S gerahmen Saw arm...
Страница 100: ...100 Manual version 2 00 May 2016 Manual rev 2 7 11 Kusovn k St ckliste Piece list Rameno S gerahmen Saw arm...
Страница 101: ...101 7 12 Kart Brush B rste...
Страница 102: ...102 Manual version 2 00 May 2016 Manual rev 2 7 13 Pohon Antrieb Drive...
Страница 103: ...103 7 14 Nap n n Spannung Tensioning...
Страница 104: ...104 Manual version 2 00 May 2016 Manual rev 2 7 15 Kusovn k St ckliste Piece list Nap n n Spannung Tensioning...
Страница 105: ...105 7 16 Veden p su S gebandf hrung Belt guide...
Страница 106: ...106 Manual version 2 00 May 2016 Manual rev 2 7 17 Kusovn k St ckliste Piece list Veden p su S gebandf hrung Belt guide...
Страница 107: ...107 7 18 Chlazen K hlung Cooling...
Страница 108: ...108 Manual version 2 00 May 2016 Manual rev 2...
Страница 109: ...109 7 19 V lec tlum c D mpfungszylinder Damping cylinder...
Страница 111: ...111 7 21 St l Table Tisch...
Страница 112: ...112 Manual version 2 00 May 2016 Manual rev 2 7 22 Kusovn k St ckliste Piece list St l Table Tisch...
Страница 113: ...113 7 23 Ovl dac panel Bedienpult Control panel...