10
5
Be sure of everything is ready before using.
(2) After operation
1
Turn off the power switch
2
Take down the tools
3
Clean the machine and coat with lubrication.
4
Cover the machine with cloth to keep out the dust.
(3)Adjusting the gearbox
1
To raise and lower the gearbox, loosen the two lock nuts, revolve the
crank handle, when the desired height is reached, tightened the lock
nuts. make sure the gear box is tightened at the column.
2
The gear box can revolve 360
°
after loosing the above bolts, and
tighten the heavy-duty lock nut on the gear box after adjusting the
gear box on the desired angle.
3
As drilling bevel, please loose three nuts connecting gearbox and slip
saddle up to the angle on the indicator you need, and then lock them.
(4) Preparing for drilling (expect the machine which is installed
mechanical power feed system)
As drilling, revolve handle against clockwise, make the worm gear
break away from handle base, then drilling pass hole, you also can put
the positive depth stop gauge on the depth you need to drill blind hole.