
SIGNAL-20P MAINTENANCE
47
Partition status
Reader indicator mode
Light color
"Intrusion Alarm", "Fire
Alarm", "Fire Prealarm",
"Arm Failed"
Blinks with 2 Hz frequency
Yellow
"Fire Trouble"
Blinks with 5 Hz frequency
Yellow
If the presented identifier is unknown or has low authority level the
net controller denies the access and the device indicate this event by triple
flashes and subsequent turning on with red light.
6 MAINTENANCE
To make sure that the device is in reliable working condition test it on
receipt and once a year. The testing shall include:
- Visual inspection of the possible mechanical damage of the device
case
- Inspection of the device mounting security and contacting wire and
contact coupling statuses
- Functional testing of the device efficiency accordingly with the sec-
tion 6.1 of this manual
6.1 Device
testing
The purpose of this testing is the inspection of device operability
when having received and once a year during performance. The test in-
cludes the functional check with the aim of showing up possible defects
and their operability status estimation. If the device doesn’t meet the re-
quirements of the checking procedure described below then appeal to the
manufacturer.
The device shall be tested under the following ambient conditions:
- Temperature - (25 + 10)
о
С
- Relative humidity - (45 - 80) %
- Atmospheric pressure – (630 – 800) mm Hg
The device testing connection diagram is presented in the Appendix
D. The operability status testing time is no more than 10 minutes.
Note!
The wire connection or disconnection when testing is realized
under power-off conditions.
6.1.1 Overall functional testing
а
) Energize the device
b) Verify the indicator "Ready" being switched on
Содержание SIGNAL-20P
Страница 1: ...SIGNAL 20P Intrusion Fire Alarm Addressable 20 Loop Control Device Installer s and User s manual ...
Страница 52: ...INTRUSION FIRE ALARM ADDRESSABLE 20 LOOP CONTROL DEVICE 52 Appendix C SIGNAL 20P connection diagram ...
Страница 53: ...APPENDIX D SIGNAL 20P TESTING CONNECTION DIAGRAM 53 Appendix D SIGNAL 20P testing connection diagram ...