Before installation
Inner transit packaging removal & unit placement
Before installation, check the extraction unit for damage.
All packaging must be removed before the unit is connected
to the power supply.
Please read all instructions in this manual before using
this extractor.
1.
Move the unit to the location where it is going to be
installed and remove the outer packaging.
This unit
should be installed in a well-ventilated area.
2. Open the front door and remove the transit foam
from the centre of the unit.
Caution
Due to the weight of the extractor suitable lifting equipment
should be used and with regard to appropriate safety
precautions. (See Appendix for product weight details)
Ensure that 500 mm space is available around any vented
panels on the extractor to ensure adequate airflow.
3. With the unit in position lock the 2 front castors.
Caution
Do not block or cover the cooling vents on the unit, as this
severely restricts airflow and may cause damage to
the unit.
Caution
Under no circumstances should the exhaust outlet/s be
covered as this will restrict the airflow and cause
overheating.
4. Check the filters are located in their correct position
before closing the door and securing the door latches.
3
01
Содержание AD500 iQ
Страница 1: ...AD500 iQ V3 AUG 17 ...