STEP 2 Upright Frame Assembly
5
1. Attach the
VERTICAL GUIDE ROD (7)
to the
BASE FRAME
(1)
.
Attach
UPRIGHT FRAME (6)
to the
LEFT BASE
BEARING HOUSING (11)
using three
1/2" X 2-1/2" HEX
BOLTS (24)
, five
1/2" WASHERS (33)
and two
1/2" NYLON
NUT (36)
.
2. Repeat above step for right side.
0
1/4
1/2
3/4
1/4
1/2
3/4
1/4
1/2
3/4
1/4
1/2
3/4
1"
2"
3"
4"
1/4
1/2
3/4
1/4
1/2
3/4
5"
6"
(inch)
24
24
24
6
17
17
7
7
6
24
33
9L
33
33
33
36
36
31
33
36
36
33
31
9R