Product Assembly
d. Remove all
PREASSEMBLED
hardware from
Stationary
Handrails (75 & 103).
NOTE:
Refer to the image on Right with 4pcs
Hex Bolts (M10
× p1.5 × 20mm) (158)
, 4pcs
Lock Washers (M10) (116)
, 4pcs
Washers (10 x 19 x 1.5t) (122).
Save them for STEP 8f.
Also remove the 2pcs
Screws (147)
. Save them for
STEP 11
when installing the plastic covers.
e. Remove all
PREASSEMBLED
hardware from the
Base Frame (48)
NOTE:
Refer to the image Below with 2pcs
Nylon Nuts (M10 x p1.5)( 134)
, 4pcs
Washers (10
x 23 x 2.0t) (123)
, 2pcs
Lock Washers (M10) (116)
, 2pcs
Hex Bolts (M10 × p1.5 × 20mm)
(158)
, 2pcs
Phillips Pan Screws (M5 x p0.8 x 15mm) (147).
Save them for
STEP 8h.
S
TEP 8
– (
Continued) d thru e.
Please Hand Tighten All Bolts Until STEP 9
19
Содержание E1000
Страница 35: ...35 ...
Страница 36: ...Heart Rate Monitoring Device Exercise Tips 36 ...
Страница 37: ...Circuit Diagram 37 ...
Страница 40: ...Product Parts Exploded View A 40 ...
Страница 41: ...Product Parts Exploded View B 41 ...
Страница 44: ......