8
STEP 3 ASSEMBLE TOP FRAME
2
3
4
5
5
10
11a
32
32
90
90
64
64
90
90
87
87
87
34
90
87
39
90
90
90
90
87
90
87
78
84
84
84
7
9
90
78
Insert two 1" ID BUSHINGS(64) into the holes on TOP FRAME(10), then place TOP
FRAME(10) down onto GUIDE RODS(5) and CENTER UPRIGHT(4).
Attach TOP FRAME(10) to CENTER UPRIGHT(4) using three 3/8" X 3/4" HEX HEAD
BOLTS(84) and three 3/8" WASHERS(90).
(NOTE: Do Not tighten)
Attach PEC DEC UPRIGHT(2) and PRESS UPRIGHT(3) to TOP FRAME(10) each
using two 3/8"X3" HEX HEAD BOLT(78), four 3/8" WASHER(90) and two 3/8" NYLON
NUT(87).
Please check the TOP FRAME(10) is
EVENLY
seated on CENTER UPRIGHT(4),
PRESS UPRIGHT(3) and PEC DEC UPRIGHT(2) and tighten all bolts and nuts
GRADUALLY,
not individually.
Attach AB PULLEY TUBE(11a) to PRESS UPRIGHT(3) using two 3/8" x 3" HEX HEAD
BOLT(78), four 3/8" WASHER(90) and two 3/8" NYLON NUT(87).