
34
S T E P
7
Be careful to assemble all components
in the sequence they are presented.
NOTE:
Wrench tighten ALL hardware at the end of
Each Step
. Some components may be pre-as-
sembled. Nylon lock nuts will not fully screw onto bolts, they must be wrench tighten to
fully go on.
7A.
Attach Short Metal Shrouds
(WN)
and Long Metal Shrouds
(WP)
to
Weight Stack Frame
(WM)
using:
4 - (#15) M8X25mm Button Head Cap Screw
8 - (#53) 9mmX16mm Flat Washer
4 - (#42) M8 Nylon Lock Nut
7B.
Bend the Plastic Shrouds
(WS & WR)
and insert them to the side
slots of the Metal Shrouds
(WN & WP)
.
7C.
Attach Top Shroud
(WG)
to Weight Stack Frame
(WA)
using:
3 - (#14) M6X16mm Phillips Head Screw
3 - (#53) 6.6mmX12mm Flat Washer
Содержание S2LAT
Страница 1: ... A s s e m b l y I n s t r u c t i o n s O W N E R S M A N U A L v S2LAT 062116 S2LAT ...
Страница 25: ...25 S T E P 2 Above shows Step 2 assembled and completed A B 6 40 50 50 A B 6 40 50 50 ...
Страница 38: ...45 38 N o t e s PCL Badge Location ...
Страница 39: ...39 S 2 L A T E x p l o d e d V i e w ...