
28
S T E P
4
Be careful to assemble all components
in the sequence they are presented.
NOTE:
Finger tighten all hardware first in this step. Wrench tighten ALL hardware at the end of
STEP 4B
. Some components may be pre-assembled. Nylon lock nuts will not fully screw
onto bolts, they must be wrench tighten to fully go on.
4A.
Attach Frame F
(F)
to Frame B
(B)
using:
1 - (#9) M12X85mm Hex Head Bolt
2 - (#51) 13mmX24mm Flat Washer
1 - (#41) M12 Nylon Lock Nut
4B.
Attach Foot Bar
(E)
to Frame A
(A)
using:
2 - (#6) M10X75mm Hex Head Bolt
4 - (#50) 11mmX20mm Flat Washer
2 - (#40) M10 Nylon Lock Nut
1 - (#62) Steel Plate
Содержание S2LAT
Страница 1: ... A s s e m b l y I n s t r u c t i o n s O W N E R S M A N U A L v S2LAT 062116 S2LAT ...
Страница 25: ...25 S T E P 2 Above shows Step 2 assembled and completed A B 6 40 50 50 A B 6 40 50 50 ...
Страница 38: ...45 38 N o t e s PCL Badge Location ...
Страница 39: ...39 S 2 L A T E x p l o d e d V i e w ...