![Body Solid GDCC250.1 Скачать руководство пользователя страница 16](http://html1.mh-extra.com/html/body-solid/gdcc250-1/gdcc250-1_owners-manual_2782946016.webp)
16
S T E P
5
S T E P
Be careful to assemble all components
in the sequence they are presented.
26
A. See diagram 1. Begin at the high pulley station. Route the Lat Pulldown Cable (96) up through the first
opening where pulley (A1) will be installed, and out through the top. Route Cable (96) above the Top
Frame (F) and then down through the second opening where pulley (A2) will be installed. Pull the
entire length of cable through.
B. See diagram 2. Insert two Pulleys (15), Pulleys (A1) and (A2), into Top Frame (F) under Cable (96)
and attach using for each pulley:
One 48 (M10 x65 hex head bolt)
Two 13 (pulley spacer)
One 56 (M10 nylon lock nut)
C. Route Cable (96) around Pulley (A3) as shown in diagram 1 and attach Pulley (A3) to Seated Press
Arm Support (N) as shown in diagram 2 using:
One 46 (M10 x 185 hex head bolt)
Two 12 (metal spacer)
One 56 (M10 nylon lock nut)
Two 109 (M10 washer)
D. See diagram 1. Feed Cable (96) above Pulley (A4) -already installed. Route Cable (96) around
Pulley (A4) and feed back between Pulley (A4) and Pulley (A6) -already installed.
E. Route Cable (96) around Pulley (A5) as shown in diagram 1 and attach Pulley (A5)to Seated Press
Arm Support (N) as shown in diagram 2 using:
One 46 (M10 x 185 hex head bolt)
Two 12 (metal spacer)
One 56 (M10 nylon lock nut)
Two 109 (M10 washer)
F. See diagram 1. Feed Cable (96) back between Pulley (A4) and Pulley (A6) -already installed. Pull
entire length of Cable (96) through, and feed down through the hole in the small arm sticking out of
Angled Support Frame (E).
mm
Inch
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
0 1" 2" 3" 4" 5" 6"
Lat Pulldown Cable (96)
Ball Stop End
Metal Ball End
4915 mm
16' 1.5"
NOTE:
All pulleys in this step are 4 1/4" diameter,except where noted in Diagram 1 and Diagram 2.
Leave all pulley bolts hand tight until Step 14 is completed.
Crossover Cable (36)
Ball Stop End
Cable End
7540mm
24’ 8
7/8
”
S T E P
Be careful to assemble all components
in the sequence they are presented.
26
A. See diagram 1. Begin at the high pulley station. Route the Lat Pulldown Cable (96) up through the first
opening where pulley (A1) will be installed, and out through the top. Route Cable (96) above the Top
Frame (F) and then down through the second opening where pulley (A2) will be installed. Pull the
entire length of cable through.
B. See diagram 2. Insert two Pulleys (15), Pulleys (A1) and (A2), into Top Frame (F) under Cable (96)
and attach using for each pulley:
One 48 (M10 x65 hex head bolt)
Two 13 (pulley spacer)
One 56 (M10 nylon lock nut)
C. Route Cable (96) around Pulley (A3) as shown in diagram 1 and attach Pulley (A3) to Seated Press
Arm Support (N) as shown in diagram 2 using:
One 46 (M10 x 185 hex head bolt)
Two 12 (metal spacer)
One 56 (M10 nylon lock nut)
Two 109 (M10 washer)
D. See diagram 1. Feed Cable (96) above Pulley (A4) -already installed. Route Cable (96) around
Pulley (A4) and feed back between Pulley (A4) and Pulley (A6) -already installed.
E. Route Cable (96) around Pulley (A5) as shown in diagram 1 and attach Pulley (A5)to Seated Press
Arm Support (N) as shown in diagram 2 using:
One 46 (M10 x 185 hex head bolt)
Two 12 (metal spacer)
One 56 (M10 nylon lock nut)
Two 109 (M10 washer)
F. See diagram 1. Feed Cable (96) back between Pulley (A4) and Pulley (A6) -already installed. Pull
entire length of Cable (96) through, and feed down through the hole in the small arm sticking out of
Angled Support Frame (E).
mm
Inch
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
0 1" 2" 3" 4" 5" 6"
Lat Pulldown Cable (96)
Ball Stop End
Metal Ball End
4915 mm
16' 1.5"
NOTE:
All pulleys in this step are 4 1/4" diameter,except where noted in Diagram 1 and Diagram 2.
Leave all pulley bolts hand tight until Step 14 is completed.
S T E P
Be careful to assemble all components
in the sequence they are presented.
26
A. See diagram 1. Begin at the high pulley station. Route the Lat Pulldown Cable (96) up through the first
opening where pulley (A1) will be installed, and out through the top. Route Cable (96) above the Top
Frame (F) and then down through the second opening where pulley (A2) will be installed. Pull the
entire length of cable through.
B. See diagram 2. Insert two Pulleys (15), Pulleys (A1) and (A2), into Top Frame (F) under Cable (96)
and attach using for each pulley:
One 48 (M10 x65 hex head bolt)
Two 13 (pulley spacer)
One 56 (M10 nylon lock nut)
C. Route Cable (96) around Pulley (A3) as shown in diagram 1 and attach Pulley (A3) to Seated Press
Arm Support (N) as shown in diagram 2 using:
One 46 (M10 x 185 hex head bolt)
Two 12 (metal spacer)
One 56 (M10 nylon lock nut)
Two 109 (M10 washer)
D. See diagram 1. Feed Cable (96) above Pulley (A4) -already installed. Route Cable (96) around
Pulley (A4) and feed back between Pulley (A4) and Pulley (A6) -already installed.
E. Route Cable (96) around Pulley (A5) as shown in diagram 1 and attach Pulley (A5)to Seated Press
Arm Support (N) as shown in diagram 2 using:
One 46 (M10 x 185 hex head bolt)
Two 12 (metal spacer)
One 56 (M10 nylon lock nut)
Two 109 (M10 washer)
F. See diagram 1. Feed Cable (96) back between Pulley (A4) and Pulley (A6) -already installed. Pull
entire length of Cable (96) through, and feed down through the hole in the small arm sticking out of
Angled Support Frame (E).
mm
Inch
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
0 1" 2" 3" 4" 5" 6"
Lat Pulldown Cable (96)
Ball Stop End
Metal Ball End
4915 mm
16' 1.5"
NOTE:
All pulleys in this step are 4 1/4" diameter,except where noted in Diagram 1 and Diagram 2.
Leave all pulley bolts hand tight until Step 14 is completed.
S T E P
Be careful to assemble all components
in the sequence they are presented.
26
A. See diagram 1. Begin at the high pulley station. Route the Lat Pulldown Cable (96) up through the first
opening where pulley (A1) will be installed, and out through the top. Route Cable (96) above the Top
Frame (F) and then down through the second opening where pulley (A2) will be installed. Pull the
entire length of cable through.
B. See diagram 2. Insert two Pulleys (15), Pulleys (A1) and (A2), into Top Frame (F) under Cable (96)
and attach using for each pulley:
One 48 (M10 x65 hex head bolt)
Two 13 (pulley spacer)
One 56 (M10 nylon lock nut)
C. Route Cable (96) around Pulley (A3) as shown in diagram 1 and attach Pulley (A3) to Seated Press
Arm Support (N) as shown in diagram 2 using:
One 46 (M10 x 185 hex head bolt)
Two 12 (metal spacer)
One 56 (M10 nylon lock nut)
Two 109 (M10 washer)
D. See diagram 1. Feed Cable (96) above Pulley (A4) -already installed. Route Cable (96) around
Pulley (A4) and feed back between Pulley (A4) and Pulley (A6) -already installed.
E. Route Cable (96) around Pulley (A5) as shown in diagram 1 and attach Pulley (A5)to Seated Press
Arm Support (N) as shown in diagram 2 using:
One 46 (M10 x 185 hex head bolt)
Two 12 (metal spacer)
One 56 (M10 nylon lock nut)
Two 109 (M10 washer)
F. See diagram 1. Feed Cable (96) back between Pulley (A4) and Pulley (A6) -already installed. Pull
entire length of Cable (96) through, and feed down through the hole in the small arm sticking out of
Angled Support Frame (E).
mm
Inch
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
0 1" 2" 3" 4" 5" 6"
Lat Pulldown Cable (96)
Ball Stop End
Metal Ball End
4915 mm
16' 1.5"
NOTE:
All pulleys in this step are 4 1/4" diameter,except where noted in Diagram 1 and Diagram 2.
Leave all pulley bolts hand tight until Step 14 is completed.
Be careful to assemble all components
in the sequence they are presented.
Finger tighten all hardware in this step unless otherwise noted.
LEFT SIDE ASSEMBLY
NOTE: Installation begins with the Right Side assembly of the GDCC.
Once completed, the Left Side assembly of the GDCC will be installed.
A.
Insert both two Foot Caps (34) into Base Frame (A), two Foot Caps (34) into Large Stabilizer Frame (K)
and two Foot Caps (34) into Small Stabilizer Frame (J).
B.
Insert End Cap (33) into Base Frame (A).
C.
Slide Small Stabilizer Frame (J) onto Base Frame (A) and secure using:
Two 3 (M10x75 hex head bolt)
Four 19 (M10 washer)
Two 13 (M10 nylon nut)
D.
Slide Large Stabilizer Frame (K) onto Base Frame (A) and secure using:
One 3 (M10x75 hex head bolt)
Two 19 (M10 washer)
One 13 (M10 nylon nut)
E.
Slide Guide Post (G) into Base Frame (A) and secure using:
One 3 (M10x75 hex head bolt)
Two 19 (M10 washer)
One 13 (M10 nylon nut)
F.
Insert both Nylon Bushings (31) into Handle (D), then slide Handle (D) onto Guide Post (G) noting the direction
of the Pop Pin on Handle (D) aligns with the pre-punched holes on Guide Post (G).
NOTE: Make sure both Nylon Bushings (31) fit securely into Handle (D).
Silicone Oil may be used to lubricate Guide Post (D) to ease Handle (D) installation.
G.
Insert Lower Pulley (26) into Double Pulley Holder (55) and secure using:
One 1 (1/2” x 50mm hex head bolt)
Two 17 (1/2” washer)
One 14 (1/2” nylon nut)
H.
Install Upper Pulley (26) and the Cable End of Crossover Cable (36) to Double Pulley Holder (55) using:
One 1 (1/2” x 50mm hex head bolt)
Two 17 (1/2” washer)
One 14 (1/2” nylon nut)
NOTE: Let Crossover Cable (36) hang. This will speed up the assembly process in later steps.
I.
Insert Pulley (25) into Base Frame (A) and secure using:
One 3 (M10x75 hex head bolt)
Two 28 (21.5mm steel bushing)
One 13 (M10 nylon nut)
J.
Connect Handle (39) to Snap Link (30), then attach Snap Link (30) to the Ball Stop End of Crossover Cable
(36) as shown in the diagram.
Содержание GDCC250.1
Страница 42: ...42 ...