VKR1
7
00
/1010
Power Tower
Assembly Instructions
Page
7
A s s e m b l y S t e p 3
Hardware Required
BOLT
Washer
Nut
#40 Carriage Bolt (M8x65 mm)
[4 pieces]
#41 Hex Bolt (M8x70 mm)
[4 pieces]
#25 Nylon Nut (M8)
[8 pieces]
#37 Large Curved Washer (M8)
[4 pieces]
Connect the upper part of each
Support (#1104)
to the
Upright
Base (#1102)
by inserting two
Hex Bolts (#41)
, through two
Large
Curved Washers (#37)
and then through the
Upright Base (#1102)
followed by the
Support (#1104)
and secure it with two
Nylon Nuts
Attach the lower part of each
Support (#1104)
to the
Left/Right
Stabilizers (#1101L/R)
by using four
Carriage Bolts (#40)
and four
Nylon Nuts (#25).
For now, hand-tighten the
Nylon Nuts (#25)
on the lower portion to avoid over-tightening and misalignment
of holes on the upper portion.
At this point, you should now tighten the
Nylon Nuts (#25)
that
were hand-tightened in the lower portion with a wrench.
Repeat this process on the other side.
(#25).