3.2 Installation
n
Fix the wall bracket using the plugs and screws supplied (fixing points (5)).
n
Clip the clock in place on the bracket and
secure with the
anti-theft locking
screw provided
(see fig.2).
n
Remove the protective sheet from the front
panel and use the anti-static cloth to clean
the clock.
Mounting on vertical bracket or
ceiling bracket :
n
Cristalys or Opalys clocks can be installed on various types of brackets (ref. 938901,
938907 and 938908). See the installation manual delivered with the bracket.
Remark :
the clock could be installed on a table fixing (in option), see figure 2.
27
9
0
C
°
Sel.
Reset
1
5
0
161
100
Fig. 2
Setting of the table bracket (if supplied)
(in the 2 notches of the wall bracket).
Anti-theft locking screw.
C
°
Sel.
Reset
Fixing
points