24
X - Mounting behind basketball backboard (BT6008)
For each 24 second display, the mounting kit is supplied with :
- 1 support mast
- 1 shoe
- 2 U sections
- Ø12 flat washers
- M10x185 threaded shafts
- H M10 x 90 screws
- HU M10 nuts
- plywood
- M10x90 bolts
- H M10x50 screws
- Ø10 flat washers
1/ According to the type of basketball boards, extend the support mast (60 × 30 tube) for each display
until it reaches the final position (regulation distance for dimensions L).
2/ Fix the shoe with 4 threaded flat washers and plywood to the arm of the basketball goal
(See D).
3/ Fix the 2 U sections to the mast (level depending on model).
4/ Position the mast in the shoe with 1 HM10×90 screw, 1 HU M10 nut and Ø10 flat washer.
5/ Rotate the mast vertically, then lock it with a HM10×90 screw, 1 HU M10 nut and Ø10 flat washer to
the opening of the shoe.
6/ Fix the display to the mast with H M10x60 bolts, HU M10 nuts, Ø10 flat washers and Ø10 washers
(B).
7/ Check the distance L (30 to 50 cm). Once the panel is in the right position, drill all the way through
the mast tube (Ø11) and fit in a HM10×90 screw, 1 HU M10 lock nut and Ø10 flat washer to hold the
panel in its final vertical position.
A
A
HM10x90 screw
Ø10 flat washer
HU M10 nuts
M10x185 threaded shaft
Ø10 flat washer
HU M10 nuts
Pivot axis
Drill through the tube to Ø11 in the vertical position
to hold the display unit in the fixed and final position.
With 1x H M10x90 screw and 1x HU M10 nut.
arm of the basketball goal
(100 to 140 square tube).
Cut the tube
Cut the tube
U M10 Nut
Ø10 flat washer
Ø10 flat washer
H M10x60 bolt
B
B
B
A
A