
Page 2
Table of Contents
Specifications
··································································································
4
Safety First
Getting Started
·······························································································
5
Required Tools
Good Ideas
For More Information
E3 Hardware Parts Guide
················································································
6
Z
-
Spindle Mount Assembly Instructions
························································
7
-
17
Wood Components (included with the kit)
Required Hardware (included with the kit)
Illustrated Steps
Y Carriage Assembly Instructions
···································································
18
-
37
Wood Components (included with the kit)
Required Hardware (included with the kit)
Illustrated Steps
Frame Assembly Instructions
·········································································
38
-
42
Wood Components (included with the kit)
Required Hardware (included with the kit)
Illustrated Steps
Gantry Assembly Instructions
········································································
43
-
55
Wood Components (included with the kit)
Required Hardware (included with the kit)
Illustrated Steps
Gantry Electronic and GT2 Pulley Instructions
···············································
56
-
60
Gantry Installation Instructions
·····································································
61
-
64
Wood Components (included with the kit)
Required Hardware (included with the kit)
Illustrated Steps
Y Carriage Installation Instructions
································································
65
-
69
Wood Components (included with the kit)
Required Hardware (included with the kit)
Illustrated Steps
Содержание E3
Страница 1: ...Page 1 Version 2 15 Assembly Manual E3 ...
Страница 12: ...Page 12 Step 9 Preparing the DeWalt 660 Rotary Tool for Mounting see next page for step by step instructions ...
Страница 21: ...Page 21 Step 5 Attach Y Carriage Bottom Support and secure with five M4 x 16 screws and nuts ...
Страница 22: ...Page 22 Step 6 Attach Z Rail Stop and secure with two M4 x 16 screws and nuts ...
Страница 31: ...Page 31 Slide 8 x 22 x 7 Bearing on Threaded Rod Thread 5 16 Nut on top of the Bearing ...
Страница 37: ...Page 37 Secure Stepper Motor Mount with four M4 x 16 Screws and Nuts ...
Страница 45: ...Page 45 1 2 IMPORTANT Note the orientation of the Controller Mount below ...
Страница 46: ...Page 46 1 4 Using slots and tabs set the Controller Mount Assembly on the Gantry Frame 1 3 ...
Страница 49: ...Page 49 Attach Y Stepper Motor Mount and secure with a M4 x 16 screws and nuts Step 3 Stepper Motor Mount ...
Страница 50: ...Page 50 Attach Idler Mount and secure with a M4 x 16 screw and nut Step 4 ...
Страница 52: ...Page 52 Attach both Gantry Corner Braces and secure each with two M4 x 16 screws and nuts Step 6 ...
Страница 60: ...Page 60 ...
Страница 71: ...Page 71 These photos illustrate how the belt wraps around the GT2 Pulley and Idler ...
Страница 79: ...Page 79 Route the Power Supply as shown connect to Controller and secure in place with Small Zip Ties Step 5 ...